RIU Explorers Conference Presentation
Released
Released
Announcement PDF
ASX:AKA
RIU Explorers Conference
Perth February 2026
19 February 2026 aureka.com.au
ASX:AKA |
This presentation has been prepared by Aureka Limited (Aureka or the Company). It contains general information about the Company’s activities current as at the date of the
presentation. The information is provided in summary form and does not purport to be complete. This presentation is not to be distributed (nor taken to have been distributed) to
any persons in any jurisdictions to whom an offer or solicitation to buy shares in the Company would be unlawful. Any recipient of the presentation should observe any such
restrictions on the distribution of this presentation and warrants to the Company that the receipt of the presentation is not unlawful. It should not be considered as an offer or
invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to
subscribe for securities in the Company will be entered into on the basis of this presentation or any information, opinions or conclusions expressed in the course of this
presentation. This presentation is not a prospectus, product disclosure document or other offering document under Australian law or under any other law. It has been prepared
for information purposes only and is not a recommendation as to whether to invest in Aureka shares. The information contained in this presentation is not investment or financial
product advice and is not intended to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment
objectives, financial situation or particular needs of any particular person. Unless otherwise specified, data and tables set out in this presentation are based on Aureka
management estimates.
This presentation does not include all available information on Aureka, and any potential investor should also refer to Aureka’s Annual Reports and ASX releases and take
independent professional advice before considering investing in Aureka. For more information about Aureka Limited, visit the website at www.aureka.com.au.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, none of Aureka or its directors, or any of their employees or agents, nor any other person accepts any liability, including,
without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation
or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, projections, prospects or
returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant
uncertainties and contingencies. Past performance is no guarantee of future performance.
This presentation may contain “forward-looking statements” within the meaning of securities laws of applicable jurisdictions. Forward-looking statements can generally be
identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe”, “continue”, “objectives”, “outlook”, “guidance” or
other similar words, and include statements regarding certain plans, strategies and objectives of management and expected financial performance. These forward-looking
statements involve known and unknown risks, uncertainties and other factors, many of which are outside the control of Aureka and any of its officers, employees, agents or
associates. Actual results, performance or achievements may vary materially from any projections and forward-looking statements and the assumptions on which those
statements are based. Readers are cautioned not to place undue reliance on forward-looking statements and Aureka assumes no obligation to update such information
Competent Person Statement
The Mineral Resources and Ore Reserves statements and the Exploration Target potential statement are based on and fairly represents, information and supporting
documentation prepared by the Competent Persons. The Mineral Resources, Exploration Targets and Ore Reserves statement has been approved by Mr Jozef Story, who is a
Member of the Australian Institute of Geoscientists (MAIG) (#10079). Mr. Story has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.” Mr. Story consents to the publishing of the information in this presentation in the form and context in which it appears.The
Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant ASX announcement continue to apply and have not materially changed.
Forward
Looking
Statement
2
aureka.com.au
ASX:AKA |
Exploration Target
On 30 March, 2021, Navarre Minerals Limited ASX:NML announced the maiden gold Exploration Target at its flagship 100%-owned Irvine Gold Project in Victoria, Australia. Notably, the Exploration Target was constrained to the
current drill footprint at the Resolution and Adventure lodes, as at the time these areas only contained sufficient drilling to determine continuity and infer grade ranges. The Navarre portfolio was purchased and rebranded by the
Aureka team in 2024. Significant potential exists to increase the size of the exploration target with additional drill results beyond the Exploration Target area. On 26 May 2025, Aureka (ASX.AKA), announced an updated Exploration
Target total to include for historic drilling at St Arnaud, yielding a maiden JORC resource and Exploration Target.
The potential quantity and grade of the Exploration Target is conceptual in nature and therefore is an approximation. There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration
will result in the estimation of a Mineral Resource. The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code.
Summary of Relevant Exploration Data, Methodology, and Assumptions
Previously engaged consultants had, in conjunction with Company personnel generated an estimate of the Exploration Target for the Resolution and Adventure prospects. These Exploration Targets represent the strike and
depth/plunge extensions to the Mineral Resources defined for both deposits. The results of this estimation are presented in Table 1 for the combined Exploration Targets. The Resolution and Adventure prospects are intersected by
a predominantly west dipping shear zone which broadly mimics the strike of the Irvine basalt dome. Gold occurs on or adjacent to the shear zone, typically on meta-basalt/meta-sediment contacts where the rheological contrast
provides an ideal locale for shearing and mineralisation. The attitude of the contacts also influences the shear geometry resulting in localised, high-grade gold shoots.
The Exploration Target was based on the interpretation of the following geology and mineralisation data that had been collated as part of the 2021 MRE statement:
42 structurally oriented diamond drillholes and169 aircore, drill holes for a total of 23,465 m at the Resolution prospect that have been drilled by Navarre Minerals (NML),
10 structurally oriented diamond drillholes and 195 aircore, drill holes for a total of 17,952 m at the Resolution prospect that have been drilled by Navarre Minerals (NML),
943 density measurements on mineralised diamond drill core, and the determined SG’s were applied to the appropriate lithological units involved with the Exploration Target,
surface geological mapping, costean data and diamond core geological logging,
detailed LiDAR imagery,
geophysical datasets including detailed ground magnetic and 3D induced polarisation, and
wireframing and modelling of the Resolution and Adventure mineralised bodies.
For the Resolution prospect, the Exploration Target has been estimated based on the strike continuity and down plunge continuity of the mineralisation defined by drilling and modelled as part of the Mineral Resources. The extent
of this strike and plunge continuity is considered to be consistent with that evident in the Magdala deposit analogue to the north of Resolution, as the mineralisation controls and style are consistent between the two deposits.
To determine the tonnage and grade ranges for the Resolution prospect Exploration Target, the existing Mineral Resources as defined at Resolution was used as the base case in combination with the geological understanding of
the mineralisation model for Resolution. The northern strike extents component of the Exploration Target has been based on the initial wide spaced shallow AC drilling that extends approximately 900 metres to the north of the
defined Resolution mineralisation. The Consultants determined that the potential for a repeat of the mineralisation defined in the upper parts of Resolution along strike is adequate for estimating an Exploration Target that is within
+/-20% of the Resolution open pit Mineral Resource. In addition, the strong southerly plunge controls evident with the deeper parts of the Resolution Mineral Resource have been used to guide the estimation of an Exploration
Target down this plunge direction at depth. This part of the Exploration Target has used the UG Mineral Resource defined at an MSO cut-off grade of 1.4 g/t Au as a base with a +/-20% range applied for the tonnage, grade and
ounces.
For the Adventure prospect, the Exploration Target has been estimated based on the wide spaced exploration drilling that has been completed to date. The mineralisation as defined by these drill results does not currently have
adequate confidence to be classified as a Mineral Resource. However, Mining Plus considers that the estimation of an Exploration Target is possible for the mineralised extents that have been modelled. The ranges for tonnage,
grade and ounces have been estimated using the Adventure block model results reported at a 1 g/t Au cut-off (Figure 10) for those estimated blocks remaining unclassified (that do not satisfy the criteria of an Inferred Mineral
Resource). A -20% and +30% range has then been applied to determine the ranges required for reporting an Exploration Target*. It is important to note that as these estimated blocks do not meet the requirements of a Mineral
Resource, there is increased likelihood of grade extrapolation, rather than interpolation, hence the application of suitable tonnage, grade and ounce ranges for the Adventure Prospect Exploration Target. The upper grade, tonnage
and ounces range of +30% has been based on the presence of two of the higher grade and thicker intercepts returned to date for Adventure being located at the base of the Exploration Target.
Exploration
Target
3
aureka.com.au
ASX:AKA |
Continuous Diamond Drilling & Attractive
Valuation
• Previously peak ~$150m Market Cap on these assets in 2020
• Low EV = attractive EV per ounce of JORC
>360koz of JORC Resource and >400koz ETs
• Stawell Irvine: JORC Inferred (304koz @ 2.43g/t)
+ Exploration Target* (280-420koz @ 2-3g/t)
• St Arnaud Comstock: JORC Inferred (56koz @ 1.21g/t)
+ Exploration Target* (112-116koz @ 1.2-1.0g/t)
Advanced Stage Gold Exploration Projects
• Existing discoveries and substantial projects
• Projects are proximate to operating mines
• Long term approach (e.g. permanent land access)
Clean Balance Sheet & Top Teir Team
• Top Tier Director and Executive team
• No debt and well funded for continuous drilling
• Backed by small Institutions and HNWs
Positioned for significant growth
4
aureka.com.au
*The potential quality and grade of this exploration target is conceptual in nature, there is currently insufficient exploration completed to support a mineral resource of this size and it is
uncertain whether continued exploration will result in the estimation of a JORC resource. The exploration target has been prepared in accordance with the JORC Code (2012). A detailed basis
for this statement, including the completed exploration activity, has been provided on slide 3 of this presentation
ASX:AKA |
Capital Structure is Set Up for Success
aureka.com.au 5
BOARD OF DIRECTORS
Graeme Hunt Non-Executive Chairman
James Gurry Managing Director
Richard Taylor Non-Executive Director
Angela Lorrigan Non-Executive Director – Technical Director
AKAAAC Performance rights: 10,300,000 (various strike prices 15c, 20c , 25c, 30c) AKAAAD Broker Options: 3,092,000 (exp, 8-Nov-27, strike $0.20). ZEPOS:
3,434,286 for Directors based on length of service.
$0.12
Share Price (12/02/26)
<$20m
Market Cap
<$15m
Enterprise Value
$5.0m
Cash at Bank 31 Dec 2025
158m
Shares in Issue
CAPITAL STRUCTURE
$0
No debt or convertibles
60.5%
3.9%
5.6%
30.0%
BOARD OF DIRECTORS
INSTITUTIONS
HNW / FAMILY OFFICES
OTHER
SHARE REGISTER
4
$3m Placement at 13c, a 5% premium to 15-day VWAP
Funds secured land, additional work programs and WC
1
$1.7m @ 6.5c prior to listing June 2024
2
$6.5m (received bids of $9m) to fund 12-month exploration program
$0.10 per share
October 2024
3
$3m Placement at 13c, a 5% premium to 15-day VWAP
Funds secured land, additional work programs and WC
June 2025
4
$3.6m Placement at 14c per share
Funds support on-going diamond drilling programs
December 2025
AUREKA’S TOP 20 SHAREHOLDERS
REPRESENT 44% OF THE COMPANY
ASX:AKA |
Meet the Team
ASX:AKA |
Board & Key Management… Incentivised to Deliver
6
aureka.com.au
• BHP / Lihir Gold /
Newcrest
Broadspectrum /
• AGL Energy
• Head of Public Affairs
Newmont Asia Pacific
• Mineral Deposits /
PanAust / MMG
• Credit Suisse /
Deutsche Bank
• Red Hawk Iron Ore
(RHK)
• Southern Cross Gold
(SX2) / recipient of
Tasmania’s
Twelvetrees Medal
for services to
exploration
Barrick Mining Corp
(NYSE:GOLD),
Fosterville Gold Mine,
Castlemaine Goldfields
Aligned Executive Incentives:
•Share price hurdles 25c to 40c.
•100% increase in the JORC Resource
•Successful takeover, or final investment
decision on project development.
ASX:AKA |
JORC Resource
& Exploration Target
aureka.com.au 7
Mineral Resource: Stawell Corridor Prospects & St Arnaud
Exploration Target*: Stawell Corridor Prospects & St Arnaud
The preceding statements of Mineral Resources conforms to the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012
Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may occur due to
rounding to appropriate significant figures.
*The potential quantity and grade of the Exploration Target is conceptual in nature and
there has been insufficient exploration to estimate a Mineral Resource in relation to this
Exploration Target. It is uncertain if further exploration will result in the estimation of a
Mineral Resource in relation to these Exploration Targets. A detailed basis for this
statement, including the completed exploration activity, has been provided on slide 3 of
this presentation
ASX Announcement - 30 March 2021& ASX Announcement – 26 May 2025
Stawell Corridor & St Arnaud
19% increase
in 2025
ASX:AKA |
Irvine Basalt Dome (Resolution & Adventure)
• Maiden Inferred Resource1 reported in March 2021
– 304koz at 2.4 g/t gold
• Resource hosted on east flank of basalt dome,
open down-dip and along strike.
Langi Logan Basalt Dome
• Large-scale basalt dome structure with 14.5km strike length
• Significant historical deep lead gold production in local areas
• Maiden diamond drilling program included2
• 0.5 metres at 19.8 (g/t) gold from within a broader zone of
2.4m at 5.8 g/t from 131.2 (LD002)
• 0.6 metres at 6.9 (g/t) from within a broader zone of
6.8 metres at 1.1 g/t gold from 48 metres (LD004)
S TA W E L L C O R R I D O R
G O L D P R O J E C T
8
aureka.com.au
1 ASX Announcement - 30 March 2021
2 ASX Announcement - 21 March 2022
ASX:AKA |
Stawell Corridor – Irvine Gold Project Video
ASX:AKA |
ASX:AKA |
Irvine Project – Next to world class sized deposits
10
aureka.com.au
JORC Resource and Exploration target refer ASX release - 30 March 2021
ASX:AKA |
ASX:AKA |
aureka.com.au
ASX:AKA |
Stawell Corridor – Irvine Project – Extension Drilling
11
Irvine Project (Stawell) – HIGHEST INDIVIDUAL ASSAY SINCE DISCOVERY IN 2017
Refer: ASX release - Irvine Drilling Highest Assay Since Discovery - 15 Oct 25
Aureka overview video
ASX:AKA |
ASX:AKA |
Irvine Project – Long Section - 2 lodes Resolution (264koz) and Adventure (40koz)
12
aureka.com.au
ASX:AKA |
Comstock Pit
• Maiden inferred JORC Resource1 reported 26 May 2025: 57Koz
@1.21g/t and Exploration Target2: 112-116Koz @1.2-1.0g/t
• Historic underground mining during the gold rush (1855-1913), more
recently open pit mining in 1990’s (Comstock – Nelson Line)
• Aureka’s St Arnaud Gold Project comprises 819km2 of granted
tenements, including the historical 0.4M St Arnaud Goldfield, where
high-grade gold was mined from quartz lodes in a structural setting
consistent with most gold deposits in central Victoria, including Bendigo
and Fosterville.
• Aureka’s first pass drilling confirmed several continuous lines of gold
mineralisation, extending north under cover3
• Maiden diamond drilling program completed in 2022 intersecting high-
grade gold adjacent to historic production on Nelson and New Bendigo
lines
• Previous 1m @ 1,174 g/t Au (2008) at New Bendigo4 demonstrates the
potential for high grade mineralisation
• Regional reconnaissance soils program to detect new areas of potential
mineralisation beneath Murray Basin cover
S T A R N A U D
G O L D F I E L D
13
aureka.com.au
1,2: ASX Announcement 26 May 2025
3 ASX Announcement - 30 July 2018 & 26 March 2021
4 RXM ASX Announcements - 15 & 16 April 2008
ASX:AKA |
ST ARNAUD
GOLDFIELD
14
aureka.com.au
JORC Resource 57Koz
@1.21g/t and Exploration
Target1: 112-116Koz @1.2-
1.0g/t
Previous open pit mining in
1990’s (Comstock – Nelson
Line)
Drilling success in 2025
multiple occurrences of high-
grade visible gold including:
1m @ 65.37g/t Au from
shallow 116m2, (previous 1m @ 1,174
g/t Au (2008) at New Bendigo3 demonstrates
the potential for ultra high grade
mineralisation),
Proximity to Mills with spare
capacity proximate to the
project.
1 ASX Release 26 May 2025
2 ASX Release 20 Nov 2025
3 RXM ASX Announcements - 15 & 16 April 2008.
ASX:AKA |
St Arnaud – Comstock , last mined in 1995 and proximate to multiple mills
aureka.com.au 15
B’
B
Refer ASX Release– AKA 22 Dec 2025 - St Arnaud Com stock Mineralisation Intersected
ASX:AKA |
St Arnaud, Comstock - Multiple Intercepts of Visible High-Grade Gold
aureka.com.au 16
References:
(LHS): Comstock visible gold 25NED002 intercepts: Refer AKA ASX release 29 October 2025. //
(RHS): Comstock long section. Refer ASX - 22 Dec 2025 - St Arnaud Comstock VG Mineralisaton
B’
B
ASX:AKA |
Homing in on milling options
• 45km to Wedderburn Milling Facility operated by Core Prospecting Pty Ltd
• Core Prospecting has been engaged to assess suitability of Comstock
Project for early-stage production and processing at Wedderburn Mill.
S T A R N A U D - C O M S T O C K
17
aureka.com.au
1,2: ASX Announcement 26 May 2025
3 ASX Announcement - 30 July 2018 & 26 March 2021
4 RXM ASX Announcements - 15 & 16 April 2008
ASX:AKA |
Funded & Continuous Drilling in 2025
• On-going diamond drilling in 2026 (after 7,000 metres in 2025)
• 4 holes with visible gold in 2025 plus high grade assays
Victorian Mining is Moving Ahead
• 2x recent gold project approvals (CYL, SX2)
• 2x mineral sands mine approved
• Operating mine extensions
Strategy to Commercialisation
• Irvine flagship has million ounce potential, freehold land, successful
recent drilling on extensions of JORC Resource
• St Arnaud, Comstock – potential early producer - close to hungry mills
Size of Prize is Huge
• Neighbourhood of 5.3Moz Stawell Gold Mine
• Substantial JORC Resource plus Exploration Targets
• Trading at <$50/oz and close to mills
Positioned for Growth
18
aureka.com.au
*The potential quality and grade of this exploration target is conceptual in nature, there is currently insufficient exploration completed to support a mineral resource of this size and it is uncertain whether
continued exploration will result in the estimation of a JORC resource. The exploration target has been prepared in accordance with the JORC Code (2012). A detailed basis for this statement, including the
completed exploration activity, has been provided on slide 3 of this presentation
+61 3 9692 7222
aureka.com.au
ASX:AKA
Thank you!
Get The Latest
Aureka News
Sign Up
Share your feedback
Discover