Tenure Renewal and Lidar Sets Up Comstock's Future
Released
Released
Announcement PDF
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 1
A S X A N N O U N C E M E N T
05 MARCH 2026
TENURE RENEWAL AND HIGH-QUALITY LIDAR SETS
UP COMSTOCK’S FUTURE
ST ARNAUD – COMSTOCK PROJECT UPDATE
Aureka Limited (ASX: AKA, Aureka or the Company) is pleased to announce the 5-year renewal
of the exploration licence and the completion of a high-accuracy LiDAR and photogrammetry
for the St Arnaud Comstock open-cut pit. These are critical steps as pathways to near term low
tonnage gold production are pursued for the Comstock Project.
• Successful renewal of EL006819 (7.82km2
) secures the longer-term tenure of the St Arnaud
Comstock project until 2030. The St Arnaud Comstock pit is a former mine site, with last its last
production occurring in1995. It forms part of the broader St Arnaud gold field, which
historically produced 400koz at an estimated 15g/t Au1
.
• The capturing of high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit has
generated a seamless, high-resolution terrain and structural dataset critical for the engineering
design, operational planning and further geological interpretation required to support the
strategy of possible near term low tonnage gold production.
• The high-accuracy LiDAR and photogrammetry (see images in this release) delivers a
significantly improved Comstock data set and will aid the scoping study which will assess the
regulatory pathway and logistics for a possible early start up at St Arnaud Comstock Project.
1
St Arnaud historical production taken from: Krokowski de Vickerod, J., Moore, D.H. and Cayley, R.A., 1997
2
ASX Release, 24 Jul 2025: Multiple high-grade gold intercepts at St Arnaud Comstock
3
ASX Release, 20 Nov 2025: St Arnaud Comstock High Grade Assays
4
ASX Release, 25 Feb 2026: Newly Identified High Grade Silver Component to St Arnaud Comstock
Management
Comment
“The tenement renewal and LiDAR, comes after a highly
successful 12 months on our promising Comstock Project. During
this period, we declared our Maiden JORC Resource in May9
,
completed over 2,200 metres of diamond drilling, and reported
multiple instances of visible gold 15 & 2
. Assays showed record
intercepts (notably 1m @ 65.37g/t gold (Au) from 116.2m
including 0.3m @ 109g/t and 0.4m @ 65.4g/t) 3
. We ended the year
by signing an engagement with nearby mill owners18
and we saw
expansion of mineralisation to the north and west of the pit3.
We
also recently reported assays that included high grade 650g/t
silver4
. This all sets up Comstock for an exciting future as we
progress scoping level studies.“
- James Gurry, Managing Director
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 2
05 MARCH 2026
Figure 1 – View of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit – looking towards the South (azimuth 180).
The main Comstock Shear Zone and Walkers Shear zone are highlighted. Current entrance to the pit is possible from the Walkers Shear
side.
5
ASX Release, 24 Jul 2025: Multiple high-grade gold intercepts at St Arnaud Comstock
6
ASX Release, 20 Nov 2025: St Arnaud Comstock High Grade Assays
7
ASX Release, 25 Feb 2026: Newly Identified High Grade Silver Component to St Arnaud Comstock
Exploration
Manager
Comment
“ The successful renewal of EL006819 secures the long-term
future of St Arnaud Comstock Project, and with the newly
captured high-accuracy LiDAR and photogrammetry, the team
are planning additional work programs with potential to
further develop upon the high grade gold5
& 6
and silver7
intercepts identified during the 2025 drilling campaign, and
deliver further exploration success and continued progression
at St Arnaud.”
- Jozef Story, Exploration Manager
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 3
05 MARCH 2026
ST ARNAUD COMSTOCK PROJECT – KEY TENURE RENEWAL
• Aureka have successfully completed the renewal of EL006819, extending the period of
tenure to 21 October 2030. EL006819 encompasses not only the Comstock Project, but also
the nearby New Bendigo Line of Mineralisation (and associated targets below the New
Bendigo Mine shafts) and thereby securing the long-term tenure of the project for the
benefit of Aureka’s shareholders.
• The renewed EL006819 is contiguous to Aureka’s other tenements that together comprise
the massive 1,565km2
St Arnaud Project that is 100% owned by Aureka. The whole area is
prospective for not only gold, silver and base metals, but also critical minerals to the far
northwest - where Aureka’s tenure borders some of Victoria’s most significant and recently
approved for mining Critical Minerals projects8
.
• Securing the long-term tenure of the Comstock project enables the continuance of the
successful exploration activities in 2025 aimed at expanding upon the initial 56Koz Maiden
Resource and Exploration Target9
and provide further potential avenues to deliver near-
term small-scale gold production. While Comstock remains upon an Exploration Licence,
the related JORC Resource and LiDAR survey data are key aspects required for Aureka to
submit applications for upgraded licencing.
Figure 2 – Plan view of St Arnaud tenement holding (blue), with Comstock EL006819 (yellow/red)
8
ASX Release – Astron Corp (ATR) 20 October 2025 - Donald Project granted Australian Major Project Status
9
ASX Release, 13 Jun 2025: t Arnaud Maiden JORC MRE and Exploration Target - Amended
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 4
05 MARCH 2026
Figure 3 – Renewal Plan of Comstock EL006819 renewal (red). The renewal area contains the Nelson Line including Comstock Project (last
mined 1995) and New Bendigo Line of workings and New Bendigo Historical Mine (1885), and the Lord Nelson Historical Mine (1884-
1915) on the edge of the township of St Arnaud (also encompassed by Aureka’s tenements).
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 5
05 MARCH 2026
HIGH-ACCURACY LIDAR AND PHOTOGRAMMETRY
• Aureka has with the services of Victorian Geology and Survey Solutions Pty Ltd, acquired
high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit.
• The +300 points/m2
high density survey has generated a seamless, high-resolution
terrain model and structural dataset suitable for aiding engineering design, operational
planning and further advancing geological interpretation as the Company continues to
investigate avenues to near term low tonnage gold production.
• This highly detailed survey data, along with the Maiden JORC Resource declared in May
last year, are critical to the process to submit applications for upgraded licencing at
Comstock.
• With the current strong gold price environment in December 2025, Aureka announced10
the start of community, scoping and regulatory approval work to plan for a productive
future at Comstock and the St Arnaud gold field. Mining last took place at the Comstock
pit in 1995 when gold prices were less than USD$400/oz.
Figure 4 – View of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit with key projected structures – looking
down.
10
ASX Release, 08 December 2025: Core Prospecting St Arnaud Engagement
N
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 6
05 MARCH 2026
Figure 5 – View of the high-accuracy LiDAR and photogrammetry of the southern end of the Comstock open-cut with key projected
structures – looking towards the North (azimuth 000). Entrance to the pit is currently possible from the Southeast.
Figure 6 – View of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit with key projected structures including the
pit pillar – looking towards azimuth 290.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 7
05 MARCH 2026
Figure 7 – Zoomed view of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit wall – looking towards azimuth
280.
Figure 8 – View of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit – looking towards the east (azimuth 090).
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 8
05 MARCH 2026
Figure 9 – View of the high-accuracy LiDAR and photogrammetry of the Comstock open-cut pit – looking towards the South (azimuth 180).
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 9
05 MARCH 2026
Figure 10 – Comstock plan view maiden resource outline with mineralisation trends and core drill hole traces11
& 12
located within
EL006819. Red/yellow star indicates location of high-grade visible gold within 25NED00713
; Blue/Black star indicates location of high-
grade silver within 25NED004. All results recently reported4
.
11
ASX Release, 21 January 2022: Maiden Diamond Drilling on St Arnaud’s Nelson Line Intersects Broad Gold and Silver Mineralisation
12
ASX Release, 20 November 2025: St Arnaud Comstock - High Grade Assays
13
ASX Release 22 December 2025: St Arnaud Comstock Mineralisation Intersected
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 10
05 MARCH 2026
Figure 11 – Comstock Long section with significant mineral intercepts. Green callout14
, Brown callout15
& 16
14
ASX Release, 25 Feb 2026: Newly Identified High Grade Silver Component to St Arnaud
15
ASX Release, 22 Dec 2025: Shallow Visible Gold in New Structure
16
ASX Release, 13 Jun 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended
05 MARCH 2026
THE ST ARNAUD COMSTOCK PROJECT – BACKGROUND
The Comstock prospect sits on the eastern margin of the Stawell Geological zone of the Lachlan
Orogen within the Saint Arnaud Group metasediments, which are unfossiliferous, quartz rich
turbidites assumed to be Cambro-Ordovician in age. Comstock is located within the historic St
Arnaud Goldfields along the Nelson line of reef and is situated approximately 2 kilometres
north of the township of St Arnaud.
Locally, the geology of the Comstock project consists of a package of tightly folded turbidites
with distinct shale and sandstone layers of varying thicknesses. The area is dominated by a
NNW trending, west dipping fault/shear zone known as the Comstock Shear. The shear zone is
interpreted to lie within the hinge zone of a large-scale syncline and is confined by a wide, shale
dominant zone of sediments. Shale directly adjacent to the shear zone tends to be highly
carbonaceous and very dark grey to black in colour. Course euhedral pyrite crystals seem to be
syngenetic to this carbon rich zone of fine sediments, quartz veining is associated with gold
mineralisation and is massive to stylolitic in texture.
Primary gold mineralisation at St Arnaud is hosted within quartz veins which are structurally
controlled within very complex structural domains associated with folding and NNW trending,
west dipping thrust faults. Gold mineralisation is hosted by quartz reef systems within brittle
fractures and faults and can extend from a few metres long to a few kilometres along strike but
usually a few hundred metres. These NNW trending reefs have steep plunging gold shoots. The
mineralisation has a base metal signature of Au + As + Ag + Pb. In historical records, the gold
ore was characterised by a relatively high sulphide content up to 5% pyrite, chalcopyrite,
arsenopyrite, galena and silver. Most of the mines stopped at the oxide-sulphide interface due
to reduced grade and poor recoveries from sulphide ores. The St Arnaud Comstock pit is a
previous mine site (last production 1995) and lies within the greater St Arnaud gold fields that
historically produced 400koz at an estimated 15g/t Au17
. There appears to be an apparent
association with green-black carbonaceous shales and higher gold grades.
Proximity to Infrastructure
St Arnaud Gold Project and the Comstock pit lie within trucking distance to a number of gold
processing plants in Victoria. With the current strong gold price environment Aureka intends to
begin community, scoping and regulatory approval work to plan for a productive future at
Comstock and the St Arnaud gold field.
On 8 December 2025, Aureka announced it has engaged mill owners and small-scale Victorian
gold production specialists, Core Prospecting Pty Ltd, to assist with the advancement of the St
Arnaud Comstock Project and significantly de-risk Aureka's potential pathway to first
production18
.
17
St Arnaud historical production taken from: Krokowski de Vickerod, J., Moore, D.H. and Cayley, R.A., 1997
18
ASX Release, 08 December 2025: Core Prospecting St Arnaud Engagement
05 MARCH 2026
Figure 12 – St Arnaud Comstock Project relative location to a number of gold processing mills in Victoria including Wedderburn within the
50km range. On 8th December 2025, Aureka announced it has engaged mill owners and small-scale Victorian gold production specialists,
Core Prospecting, to assist with the advancement of the St Arnaud Comstock Project.
05 MARCH 2026
Figure 13 – High resolution photo of the St Arnaud Comstock pit, looking SE, situated within EL006819.
05 MARCH 2026
Cautionary Statement
The potential quantity and grade of the Exploration Target set out in Table 1 and Table 2 of this release are
conceptual in nature and was reported in 2021 (Irvine) and 2025 (St Arnaud). There has been insufficient exploration
to estimate a mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The Exploration Target has been prepared and reported in accordance with the 2012 edition of JORC Code.
Comstock Maiden Mineral Resource
In June 2025 AKA released a maiden JORC Mineral Resource Estimate (MRE) of 1.45M tonnes
at 1.21g/t Au for 56,500 oz gold19
has been determined (Table 2) and additionally, an
exploration target around the inferred resource has been estimated to range between 3.0Mt
and 3.5Mt, at grades 1.2g/t to 1.0g/t resulting in an exploration target range estimate of
112koz to 116koz of gold and potentially economic amounts of silver at a grades of 1.9g/t to
2.02g/t Ag for total of 195koz to 214koz silver20
(Table 2).
Current Mineral Resource Estimates and Exploration Targets
Table 1 – Comstock Project Mineral Resource Estimate in accordance with the 2012 edition of JORC Code21
.
The preceding statements of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may
occur due to rounding to appropriate significant figures.
Table 2 – Comstock Project estimated Exploration Target in accordance with the 2012 edition of JORC Code22
.
Prospect
Exploration Target*
Range Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
ounces (k
Oz)
Silver
Grade
(g/t)
Silver
ounces (k
Oz)
Comstock (St
Arnaud)
Lower 3.0 1.2 116 2.02 195
Upper 3.5 1.0 112 1.90 214
*The potential quantity and grade of the Exploration Target is conceptual in nature and there has been insufficient exploration
to estimate a Mineral Resource in relation to this Exploration Target. It is uncertain if further exploration will result in the
estimation of a Mineral Resource in relation to these Exploration Targets.
19
ASX Release, 13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended
20
ASX Release, 13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended
21
ASX Release, 13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended
22
ASX Release, 13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended
Prospect
Cut-Off
Gold
(g/t)
Inferred
Tonnes Gold Grade
(g/t)
Gold
Ounces
Grade
(g/t)
silver
Silver
(oz)
Comstock (St
Arnaud)
>0.5 1,450,000 1.21 56,500 2.14 100,00
05 MARCH 2026
This announcement has been approved for release by the Board of Directors.
For further information, please visit www.aureka.com.au, or contact:
Jame Gurry
James.Gurry@aureka.com.au
Ph: (03) 9692 7222
Aureka uses InvestorHub for enhanced, 2-way, communication with shareholders, providing
easy access to Company updates, reports, and announcements.
Investors are encouraged to sign up to the InvestorHub distribution list on the Company’s
website. Sing up here: https://investorhub.aureka.com.au/
Competent Persons Statements
The information in this announcement that relates to exploration results, data quality,
geological interpretations, is based on, and fairly represents, information compiled by Jozef
Story, a Competent Person who is a Member of the Australian Institute of Geoscientists (MAIG)
(#10079). Mr Story has sufficient experience that is relevant to the style of mineralisation and
type of deposits under consideration and to the activity currently being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves.” Mr Story consents to the
publishing of the information in this presentation in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially
affects the information included in the relevant announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant
announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant ASX announcement continue to apply and have not materially
changed.
The information in this announcement that relates to Mineral Resources and Ore Reserves
statements and Exploration Target potential statements is based on, and fairly represents,
information compiled by Mr. Daniel Brost BSc (Economic Geology) - MSc (Mine Engineering).
Mr. Brost is not employed by Aureka Limited and has acted as an independent consultant on
the Comstock Prospect Mineral Resource estimation. Mr. Brost is a Chartered Professional
Geology and a Member of the Australasian Institute of Geologists (#221836) and has sufficient
experience with the style of mineralisation, the deposit type under consideration and to the
activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(The JORC Code). Mr. Brost consents to the inclusion in this report of the contained technical
information relating the Mineral Resource Estimation in the form and context in which it
appears.
Share your feedback
Discover