Resolution Footwall Delivers High Grade Results
Released
Released
Announcement PDF
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 1
A S X A N N O U N C E M E N T
03 DECEMBER 2025
IRVINE DRILLING – RESOLUTION FOOTWALL
DELIVERS HIGH GRADE RESULTS
STAWELL CORRIDOR – IRVINE PROJECT
• High grade visible gold intercepts along newly identified Foot Wall Vein. Remaining
assays from drill hole RD048 return high-grade visible gold intercepts including:
○ 5.66m @ 6.13g/t Au from 489.34m (Incl 0.38m @ 85.8g/t Au from 492.18m)
• Gold mineralisation is within a weakly stylolitic sheared quartz vein with minor
arsenopyrite hosted in the Resolution Foot Wall, and adds to the wider zone previously
reported in RD048.
• The new high-grade assays are 70m below those previously reported in the Tenacity
Hanging Wall Fault1
. Disseminated sulphides within the Tenacity Hanging Wall Fault wall
included outstanding grades: 10m @ 12.1g/t Au from 413m Incl. 0.3m @ 183g/t Au from
413m, and 0.3m @ 64.3g/t Au from 413.8m.
• The new results represent the apparent along strike extension of mineralisation
identified in RD047, 135m to the north. The updated geological model suggests this
second RD048 mineralised intercept is the propagation of the mineralised vein intercepted
in drill hole RD047, drilled approximately 135m to the north in August 2025, which also
returned significant gold mineralisation associated with fine grained visible gold (VG)1
.
• These multiple high-grade assays along the newly identified Foot Wall Vein,
complement Irvine Project JORC Resource2
by providing high-grade upside on an
additional structure. Drilling will continue over the summer months.
1
ASX Release 15 October 2025 AKA: Irvine Drilling – Highest Assay since Discovery
2
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project. See Table 1 of this release for breakdown of the Resolution
MRE.
3
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project.
Management
Comment
“Our focus on persistent drilling and ongoing geological updates at
Irvine continues to deliver high grade intercepts beyond the current
304koz Mineral Resource area3
. This new foot wall structure
represents a fantastic target for additional drilling and comes so
soon after the Tenacity Hanging Wall Fault delivered us some of the
highest grades since discovery on the project.”
- James Gurry, Managing Director
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 2
A S X A N N O U N C E M E N T
03 DECEMBER 2025
IRVINE PROJECT (STAWELL CORRIDOR) - DIAMOND DRILLING HIGH GRADE ASSAYS
• Ongoing geological model updates and strategic drill targeting continues to return high
grade drilling intercepts as part of Aureka’s continuous drilling on the Irvine Project in the
Stawell Corridor. This release summarises the remaining assays for RD048, initial assays
were reported on 15 October 20254
returning some of the highest grades since discovery.
This newly reported high-grade intercept in hole RD048 is in addition to the high-grade VG
intercept previously reported in October 2025. Hole RD048, drilled by Trimac Drilling in
September and early October for a total of 533.3 metres, and has now been fully assayed
and reported within this release.
• The final assay results for RD048 reaffirm the potential for high grade gold mineralisation
supported by both VG and significant sulphide mineralisation:
○ 5.66m @ 6.13g/t Au from 489.34m (Incl 0.38m @ 85.8g/t Au from 492.18m)
4
ASX Release 15 October 2025 AKA: Irvine Drilling – Highest Assay since Discovery
Exploration
Manager
Comment
“The geology team are continuing to update and develop a new
robust geological model at Irvine which is driving our exploration
targeting and culminating in exploration success.
The most recent high grade drill results from RD048 are a prime
example. RD048 drilling was extended by a further 80m to test
the potential along strike propagation of the high-grade Foot
Wall hosted mineralised vein – previously identified within hole
RD047 drilled 135m to the north.
This resulted in the successful intersection of additional high-
grade mineralisation along the extrapolated Foot Wall vein,
demonstrating approximately 135m of potential mineralisation
strike length continuity between RD047 and RD048, and with
further development of our geological understanding, has
identified a new targeting opportunity for additional high-grade
Foot Wall structures that are yet to be thoroughly assessed.
The Resolution lode at the Irvine Project continues to deliver
exploration success for Aureka and demonstrates ongoing
upside with multiple mineralised extensions unveiled in this
year’s drilling”
- Jozef Story, Exploration Manager
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 3
03 DECEMBER 2025
Figure 1: Fine visible gold from hole RD048 at 492.18m, within 5.66m @ 6.13g/t Au from 489.34m (Incl
0.38m @ 85.8g/t Au from 492.18m.
• The multiple high grade gold mineralisation intercepts within hole RD048 confirms two
mineralised targets associated with high-grade visible gold. Substantial sulphide
mineralisation (predominantly arsenopyrite) also associated with elevated gold grade
intercepts.
• Ongoing drilling is targeting key zones along the Resolution Fault, proximal to the Tenacity
Hanging Wall Fault immediately south of the Inferred Resolution Mineral Resource5
.
5
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 4
A S X A N N O U N C E M E N T
03 DECEMBER 2025
Figure 2: Resolution Long Section showing current drilling and intercepts outside current 304koz JORC Resource (red).
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 5
A S X A N N O U N C E M E N T
03 DECEMBER 2025
Figure 3: The multiple high grade gold mineralisation intercepts within hole RD048 confirms two
mineralised targets associated with high-grade visible gold.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 6
03 DECEMBER 2025
RD048 – ONE OF THE BEST DIAMOND DRILLING SUCCESSES AT IRVINE SINCE DISCOVERY
Assay results from RD048 demonstrate the presence of high-grade gold intercepts immediately
down plunge to the southeast of the Inferred Mineral Resource (Figure 2) and have also
identified a new mineralised veining within the Footwall at Resolution. Results for the entirety
of RD048 have now been returned. The final assay results for RD048 reaffirm the potential for
high grade gold mineralisation supported by both VG and significant sulphide mineralisation:
• 5.66m @ 6.13g/t Au from 489.34m
o (Incl. 0.38m @ 85.8g/t Au from 492.18m)
This second intercept in RD048 is from a depth 489.34m and occurs on a steeply south-east
dipping quartz vein, the Resolution Footwall Vein, and is hosted in a ~100m thick sequence of
weakly metamorphosed sediments with minor basalt lenses.
While the Resolution Fault is strongly correlated with a basalt-sediment contact, the newly
discovered Resolution Footwall Vein is highly oblique to the stratigraphy and major faults. High
confidence structural measurements of the mineralised vein were obtained from each hole
which support continuity along the modelled orientation.
Discovery of high-grade gold veining, associated with fracturing of sediments and on a novel
orientation, highlights additional prospectivity in the system.
Earlier shallower, significant results for RD048 included:
• 10m @ 12.1g/t Au from 413m6
o Incl 0.3m @ 183g/t Au from 413m
o and 0.3m @ 64.3g/t Au from 413.8m
The Tenacity Fault was intersected at 413m as a 1.1m wide quartz vein containing significant
VG. The upper and lower bounds of the structure contained the majority of the VG returning
results of 0.3m @ 183g/t Au from 431m and 0.3m @ 64.3g/t Au from 431.8m.
Multiple significant quartz faults up to 30cm in size are identified within the greater 10m
intercept, leading to local enhancements in grade, associated with increased alteration, quartz
veining and arsenopyrite occurrences.
The increased mineralisation in this intercept is interpreted to occur at the intersection of the
Tenacity Fault with the contact between the basalt and sediments, leading to permeability
enhancement and increased fluid flow.
The drilling demonstrates the ongoing capacity of the Irvine project area to deliver a high-grade
component to the current resource and expand upon the current 304koz @ 2.43g/t Inferred
Resource7
.
6
ASX Release 15 October 2025 AKA: Irvine Drilling – Highest Assay since Discovery
7
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 7
03 DECEMBER 2025
LATEST INTERCEPT IS THE ALONG STRIKE PROPAGATION OF RD047
Results from RD047, also reported on 15 October1
, demonstrated the presence of VG in the
Resolution mineralised shoot immediately down plunge to the southeast of the inferred
mineral resource (Figure 2). Significant results for RD047 included:
• 0.7m @ 13.9g/t Au from 345.3m
• 0.3m @ 25.2g/t Au from 409.25m
VG was intercepted in a south-east dipping quartz vein within the footwall to the Resolution
Fault in drill hole RD047, resulting in 0.3m @ 25.2g/t Au from 409.25m. The vein contained
multiple grains of fine-grained VG with no apparent sulphides identified. The intersection
reported in this release represents the second VG footwall intercept to the Resolution Fault,
and with further improved geological knowledge, demonstrates potential for additional high-
grade footwall structures that are yet to be thoroughly tested.
IRVINE PROJECT STEP OUT PROGRAM
Aureka’s maiden diamond drill program within the Stawell Corridor Irvine Project remains in
progress as part of its continuous exploration strategy. Drilling continues to infill between the
inferred Resolution mineral resource and the step out drilling, targeting prospective geological
settings for permeability enhancement and gold mineralisation. The results from RD048
demonstrates potential for ongoing strike continuity to mineralisation along the Tenacity
Hanging Wall Fault structure immediately along strike of the Irvine JORC Resource, as well as
scope for further high grade drill targets in the Footwall of the Resolution Fault with potential
to deliver new resources and grow the Irvine Inferred Resource beyond the current 304koz Au
@ 2.43g/t8
. '
The Irvine Step Out program has made the following advancements to Aureka’s understanding
of structural and geological controls on mineralisation:
• Identification and delineation of mineralised structures in the hanging wall of the
Resolution Fault (Tenacity Fault and Resolution Hanging Wall Vein)
• Interpretation of the intersection of the Resolution and Tenacity Faults as the main
structural control of the southerly plunging mineralised shoot at Resolution, indicating
that the ore shoot is shallower (20-25o
) than previously believed (35o
).
• Identification and delineation of high-grade Resolution Foot Wall Vein in the footwall of
the Resolution Fault (this release).
• Furthered geological model and improved understanding of lithology and structural
controls on mineralisation.
8
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 8
03 DECEMBER 2025
This release summarises the now complete assay results for RD048 which follows the recent
reporting of the partial assays from hole RD048 that delivered the highest assays to date on the
project9
.
RESOLUTION GEOLOGICAL MODEL UPDATE
The maiden drill program has significantly improved the geological reinterpretation and
understanding of the plunging mineralisation controls and has assisted with delineating
multiple moderate west-dipping structures in the hanging wall of the main Resolution Fault as
well as a steeply south-east dipping structure in the foot wall. Of the west dipping hanging wall
structures, Tenacity Hanging Wall Fault is host to several VG occurrences and has potential to
rapidly transform into a considerable second order structure with the capacity to deliver
multiple higher-grade intercepts often associated with VG, immediately south of the Inferred
Mineral Resource. The south-east dipping Resolution Footwall Vein represents a narrow vein
high-grade target with further work in progress to identify additional structures on this
orientation across the project.
Additional exploration drilling is being planned at Irvine to target potential high-grade
mineralised ore shoots extensions along extrapolations of the Tenacity Hanging Wall and
Resolution Foot Wall faults. Interpretated fault intersections support a southerly 20-25° plunge
to the mineralisation, as opposed to the previously interpreted 35°.
Ongoing drilling activities are infilling several key zones between the southern boundary of the
Inferred Mineral Resource and the Resolution Step Out program (Figure 2).
9
ASX Release 15 October 2025 AKA: Irvine Drilling – Highest Assay since Discovery
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 9
03 DECEMBER 2025
IRVINE GOLD PROJECT (STAWELL ZONE) - BACKGROUND
Aureka’s flagship Irvine Gold Project is located in Western Victoria. More than $13M has been
spent on the project since discovery. Located within Victoria’s renowned Stawell Gold Corridor,
a region with a rich history of high-grade gold production and only 16km south of the operating
Stawell Gold Mine, the Irvine project features a JORC-compliant Mineral Resource of 304koz @
2.43 g/t gold10
, with an additional Exploration Target of 280 – 420koz @ 2–3 g/t11
.
The project area occupies the northern portion of the historic Ararat Goldfield and is hosted
within the Mooranambool Metamorphic Complex (MMC) of the Stawell Zone. The MMC is a
narrow belt of Cambrian turbidites and volcanic sequences with a dominant N-NW trend and
is characterised by tight folding, cleavage development and high-angle faults. The MMC is host
to the 5.3Moz Stawell Goldfield12
, including the currently operating Stawell Gold Mine.
Gold mineralisation at Irvine is associated with a package of steeply west dipping sheared basalt
(Simpson Basalt) and meta-sediments offset 50-80m from the eastern flank of a Cambrian
basalt dome (Irvine Dome) which is located on the hinge of an F2 antiform. Gold occurs on or
adjacent to the shear zone, typically on meta-basalt/meta-sediment contacts where the
rheological contrast provides an ideal locale for shearing.
Aureka continues to extend the work completed at the Irvine Project, however the below
outlines the data used to compile the 2021 JORC Resource, which was based on:
• 42 structurally oriented diamond drillholes and 169 aircore, drill holes for a total of 23,465
metres at the Resolution prospect that have been drilled by Navarre Minerals (NML),
• 10 structurally oriented diamond drillholes and 195 aircore, drill holes for a total of 17,952
metres at the Adventure prospect that have been drilled by Navarre Minerals (NML),
Figure 4: Long Projection showing significant intercepts at the Irvine Gold Project.
10
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project
11
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project
12
https://stawellgoldminescommunityhub.com.au/wp-content/uploads/2024/11/stawell-gold-corridor-conference-stawell-gold-mines-271124.pdf
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 10
03 DECEMBER 2025
Table 1: Irvine Project estimated Mineral Resources in accordance with the 2012 edition of JORC Code.
Table 2: Irvine Project estimated Exploration Target in accordance with the 2012 edition of JORC Code.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 11
03 DECEMBER 2025
Figure 5: Aureka hosts at least 8 basalt domes (green) that are commonly associated with gold
mineralisation in the Stawell zone. Geophysics helps define locations of these potentially mineralised
domes.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 12
03 DECEMBER 2025
This announcement has been approved for release by the Board of Directors.
For further information, please visit www.aureka.com.au, or contact:
James.Gurry@aureka.com.au peter@nwrcommunications.com.au
Managing Director Investor and Media Relations
Ph: (03) 9692 7222 Ph: 0412 036 231
Aureka uses InvestorHub for enhanced, 2-way, communication with shareholders, providing
easy access to Company updates, reports, and announcements. Investors are encouraged to
sign up to the InvestorHub distribution list on the Company’s website. Sing up here:
https://investorhub.aureka.com.au/
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 13
03 DECEMBER 2025
Competent Persons Statements
The information in this announcement that relates to exploration results, data quality,
geological interpretations, Mineral Resources and Ore Reserves statements and Exploration
Target potential statements for the Irvine Gold Project (Stawell Zone) is based on, and fairly
represents, information compiled by Jozef Story, a Competent Person who is a Member of the
Australian Institute of Geoscientists (MAIG) (#10079). Mr Story has sufficient experience that is
relevant to the style of mineralisation and type of deposits under consideration and to the
activity currently being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.” Mr Story consents to the publishing of the information in this presentation in
the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially
affects the information included in the relevant announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant
announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant ASX announcement continue to apply and have not materially
changed.
Exploration Target – Irvine Project
On 30 March, 2021, AKA (then trading as Navarre Minerals Limited ASX:NML) announced the
maiden gold Exploration Target at its flagship 100%-owned Resolution and Adventure projects
in Victoria, Australia. Notably, the Exploration Target was constrained to the current drill
footprint at Resolution and Adventure, as at the time these areas only contained sufficient
drilling to determine continuity and infer grade ranges. Significant potential exists to increase
the size of the exploration target with additional drill results beyond the Exploration Target
area.
The potential quantity and grade of the Exploration Target is conceptual in nature and therefore
is an approximation. There has been insufficient exploration to estimate a Mineral Resource,
and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The
Exploration Target has been prepared and reported in accordance with the 2012 edition of the
JORC Code.
Summary of Relevant Exploration Data, Methodology, and Assumptions
Previously engaged consultants had, in conjunction with the Navarre Minerals personnel
generated an estimate of the Exploration Target for the Resolution and Adventure prospects.
These Exploration Targets represent the strike and depth/plunge extensions to the Mineral
Resources defined for both deposits. The results of this estimation are presented in Table 1 for
the combined Exploration Targets.
The Resolution and Adventure prospects are intersected by a predominantly west dipping
shear zone which broadly mimics the strike of the Irvine basalt dome. Gold occurs on or
adjacent to the shear zone, typically on meta-basalt/meta-sediment contacts where the
rheological contrast provides an ideal locale for shearing and mineralisation. The attitude of
the contacts also influences the shear geometry resulting in localised, high-grade gold shoots.
The Exploration Target was based on the interpretation of the following geology and
mineralisation data that had been collated as part of the 2021 MRE statement:
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 14
03 DECEMBER 2025
• 42 structurally oriented diamond drillholes and 169 aircore, drill holes for a total of 23,465
m at the Resolution prospect that have been drilled by Navarre Minerals (NML),
• 10 structurally oriented diamond drillholes and 195 aircore, drill holes for a total of 17,952
m at the Adventure prospect that have been drilled by Navarre Minerals (NML),
• 943 density measurements on mineralised diamond drill core, and the determined SG’s
were applied to the appropriate lithological units involved with the Exploration Target,
• surface geological mapping, costean data and diamond core geological logging,
• detailed LiDAR imagery,
• geophysical datasets including detailed ground magnetic and 3D induced polarisation, and
• wireframing and modelling of the Resolution and Adventure mineralised bodies.
For the Resolution prospect, the Exploration Target has been estimated based on the strike
continuity and down plunge continuity of the mineralisation defined by drilling and modelled
as part of the Mineral Resources. The extent of this strike and plunge continuity is considered
to be consistent with that evident in the Magdala deposit analogue to the north of Resolution,
as the mineralisation controls and style are consistent between the two deposits.
To determine the tonnage and grade ranges for the Resolution prospect Exploration Target, the
existing Mineral Resources as defined at Resolution was used as the base case in combination
with the geological understanding of the mineralisation model for Resolution. The northern
strike extents component of the Exploration Target has been based on the initial wide spaced
shallow AC drilling that extends approximately 900 metres to the north of the defined
Resolution mineralisation. The Consultants determined that the potential for a repeat of the
mineralisation defined in the upper parts of Resolution along strike is adequate for estimating
an Exploration Target that is within +/-20% of the Resolution open pit Mineral Resource. In
addition, the strong southerly plunge controls evident with the deeper parts of the Resolution
Mineral Resource have been used to guide the estimation of an Exploration Target down this
plunge direction at depth. This part of the Exploration Target has used the UG Mineral Resource
defined at an MSO cut-off grade of 1.4 g/t Au as a base with a +/-20% range applied for the
tonnage, grade and ounces.
For the Adventure prospect, the Exploration Target has been estimated based on the wide
spaced exploration drilling that has been completed to date. The mineralisation as defined by
these drill results does not currently have adequate confidence to be classified as a Mineral
Resource. However, Mining Plus considers that the estimation of an Exploration Target is
possible for the mineralised extents that have been modelled. The ranges for tonnage, grade
and ounces have been estimated using the Adventure block model results reported at a 1 g/t
Au cut-off (Figure 10) for those estimated blocks remaining unclassified (that do not satisfy the
criteria of an Inferred Mineral Resource). A -20% and +30% range has then been applied to
determine the ranges required for reporting an Exploration Target*. It is important to note that
as these estimated blocks do not meet the requirements of a Mineral Resource, there is
increased likelihood of grade extrapolation, rather than interpolation, hence the application of
suitable tonnage, grade and ounce ranges for the Adventure Prospect Exploration Target. The
upper grade, tonnage and ounces range of +30% has been based on the presence of two of the
higher grade and thicker intercepts returned to date for Adventure being located at the base of
the Exploration Target.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 15
03 DECEMBER 2025
APPENDIX A
Table 1 – Summary of remaining key assays returned from Hole RD048 of the Resolution drilling program
Hole
ID
Easting
(MGA)
Northing
(MGA)
RL
(AHD)
Azimuth
(MGA)o Dipo
Dep
th
(m)
Sample ID From To
Interv
al (m)
Grade
(g/t)
Au
Comment
RD048 665485 5881227 300 011 -81
533.
3
AKA002052 413 413.3 0.3 183
10m @ 12.1g/t
Au
Including
0.3m @183g/t
Au from 413m
And
0.3m @ 64.3g/t
Au from 413.8m
AKA002056 413.3 413.8 0.5 4.11
AKA002057 413.8 414.1 0.3 64.3
AKA002060 414.1 414.65 0.55 4.29
AKA002061 414.65 415.65 1 2.65
AKA002062 415.65 416.45 0.8 2.54
AKA002063 416.45 417.3 0.85 4.89
AKA002064 417.3 417.6 0.3 9.56
AKA002065 417.6 417.9 0.3 16.5
AKA002066 417.9 418.2 0.3 23.3
AKA002067 418.2 419.05 0.85 1.73
AKA002069 419.05 419.4 0.35 3.59
AKA002071 419.4 420 0.6 1.37
AKA002072 420 420.45 0.45 0.09
AKA002073 420.45 421 0.55 0.21
AKA002074 421 422 1 7.58
AKA002075 422 423 1 5.97
AKA002342 489.34 490.23 0.89 0.42
5.66m @ 6.13g/t
Au from
489.34m
Including
0.38m @ 85.8g/t
Au from
492.18m
AKA002343 490.23 490.55 0.32 0.77
AKA002344 490.55 491.58 1.03 0.19
AKA002345 491.58 492.18 0.6 0.91
AKA002346 492.18 492.56 0.38 85.8
AKA002347 492.56 493 0.44 0.74
AKA003013 493 494 1 0.19
AKA003014 494 495 1 0.19
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 16
03 DECEMBER 2025
APPENDIX B
Irvine Gold Project
JORC Code, 2012 Edition - Table 1
Section 1 Sampling Techniques and Data
Criteria Commentary
Sampling techniques Diamond Core Drilling
• The diamond drill core samples were selected on geological
intervals varying from 0.20m to 1.0m in length.
• All drill core was routinely cut in half (usually on the right of the
marked orientation line) with a diamond saw and submitted for
analysis.
• Representative sample was ensured by a combination of
Company Procedures regarding quality control (QC) and quality
assurance/ Testing (QA). Certified standards and blanks were
routinely inserted into assay batches.
Drilling techniques Diamond Core Drilling
• Pre-collars were drilled to solid bedrock using an HQ3 drill bit
(93mm hole diameter) coring down to solid rock followed by
HWT casing diamond (114.3mm hole diameter)
• Diamond drilling of HQ3 (triple-tube) was undertaken where
possible to ensure maximum core recovery.
• RD048 reduced to NQ2 size (76mm hole diameter) from a depth
of 150.0m down-hole
• All drill core was orientated with a Reflex ACT III core orientation
tool then continuously marked with a line while on an angle iron
cradle.
• Upon completion of the primary hole a gyroscopic survey of the
hole was undertaken at a spacing of 1.0m along the length of the
hole.
Drill sample recovery Diamond Core Drilling
• All diamond core was logged for lithology, alteration, quartz
veining and to a standard acceptable for subsequent
interpretation capturing any core loss, if present, and recorded
in the database.
• All drill depths are checked against the depth provided on the
core blocks and rod counts are routinely carried out by the
driller.
• Core recovery for the areas sampled was generally good.
Logging • Geological logging of samples followed Company and industry
common practice. Qualitative logging of samples included (but
was not limited to); lithology, mineralogy, alteration, veining
and weathering.
• All logging is quantitative, based on visual field estimates.
Detailed diamond core logging, with digital capture, was
conducted for 100% of the core by Aureka’s geological team.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 17
03 DECEMBER 2025
Sub-sampling techniques and sample
preparation
Diamond Core Drilling
• Detailed diamond core logging, with digital capture, was
conducted for 100% of the core by Aureka’s geological team.
• Half core was sampled from NQ and HQ diameter drill core.
• Company procedures were followed to ensure sub- sampling
adequacy and consistency. These included (but were not limited
to), daily workplace inspections of sampling equipment and
practices.
• Blanks and certified reference materials are submitted with the
samples to the laboratory as part of the quality control
procedures.
• No second-half sampling has been conducted at this stage.
The sample sizes are appropriate to correctly represent the
sought after mineralisation.
Quality of assay data and laboratory tests • Analysis for gold is undertaken Bendigo, VIC by 50g Fire Assay
with an AAS finish to a lower detection limit of 0.01ppm Au and
or Photon assay analysis down to 0.01ppm lower detection limit
using OSLS technique PE01S and PAAU02.
• It is the company’s intention for a 35 element Aqua Regia ICP-AES
analysis to be undertaken on selective samples to assist
interpretation of pathfinder elements.
• No field non-assay analysis instruments were used in the analyses
reported.
• A review of certified reference material and sample blanks
inserted by the Company indicate no significant analytical bias or
preparation errors in the reported analyses. Internal laboratory
QAQC checks are reported by the laboratory and a review of the
QAQC reports suggests the laboratory is performing within
acceptable limits.
Verification of sampling and assaying • Samples will be verified by database consultants (MX Projects)
and Aureka geologists before importing into the drill hole
database.
• No twin holes have been drilled by Aureka during this program.
• Primary data was collected for drill holes using a company specific
logging template on a company laptop using lookup codes.
• The information was sent to a database consultant for validation
and compilation into a SQL database.
• Reported drill results were compiled by the Company’s geologists
and verified by the Exploration Manager and Managing Director.
• No adjustments to assay data were made.
Location of data points • All maps and locations are in UTM Grid (GDA94 zone 54).
• All drill collars are initially measured by hand-held GPS with an
a
Share your feedback
Discover