23 June 2026
ASX Market Release
Webinar Presentation - Global JORC increase to 455koz
Aureka Limited (the Company or Aureka) advises that Managing Director, James Gurry, and Exploration
Manager Jozef Story will host a webinar to discuss the Global JORC Resource increase to 455koz on
Wednesday 24 June 2026 at 12.00pm AEST.
Shareholders who wish to attend the webinar, are able to register via the following link:
https://zoom.us/webinar/register/WN_fD96mHMoQv6VRzMrVTzydA
Shareholders are requested to register in advance of the meeting and join at least 15 minutes before the
scheduled start time.
Shareholder questions are to be submitted electronically through the webinar interface. Joshua Baker of
RASS Research will host and facilitate the question and answer session.
Aureka is pleased to release the following Presentation which will be delivered to Shareholder’s at the
webinar on Wednesday 24 June 2026 at 12.00pm AEST.
This announcement has been approved for release by the Board.
For further information, please contact:
James Gurry
Managing Director
James.Gurry@aureka.com.au
+61 451 349 688
About Aureka
Aureka Limited (ASX: AKA) owns a portfolio of advanced stage high grade gold projects across Victoria.
The company acknowledges and thanks the traditional owners and local communities where we work.
The company's strategy is continuous exploration to uncover more of Victoria's high-grade gold and work
with neighbouring producers and strategic investors to advance projects toward development.
23 JUNE 2026
June 2026 aureka.com.au
ASX:AKA
Global JORC Resource increase
to 455koz
ASX: AKA |
This presentation has been prepared by Aureka Limited (Aureka or the Company). It contains general information about the Com pan y’s activities current as at the date of the
presentation. The information is provided in summary form and does not purport to be complete. This presentation is not to be distributed (nor taken to have been distributed) to
any persons in any jurisdictions to whom an offer or solicitation to buy shares in the Company would be unlawful. Any recipie nt of the presentation should observe any such
restrictions on the distribution of this presentation and warrants to the Company that the receipt of the presentation is not un lawful. It should not be considered as an offer or
invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to
subscribe for securities in the Company will be entered into on the basis of this presentation or any information, opinions or conclusions expressed in the course of this
presentation. This presentation is not a prospectus, product disclosure document or other offering document under Australian law or under any other law. It has been prepared
for information purposes only and is not a recommendation as to whether to invest in Aureka shares. The information contained in this presentation is not investment or financial
product advice and is not intended to be used as the basis for making an investment decision. The presentation has been prepa red without taking into account the investment
objectives, financial situation or particular needs of any particular person . Unless otherwise specified, data and tables set out in this presentation are based on Aureka
management estimates.
This presentation does not include all available information on Aureka , and any potential investor should also refer to Aureka’s Annual Reports and ASX releases and take
independent professional advice before considering investing in Aureka . For more information about Aureka Limited, visit the website at www.aureka.com.au.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the i nfo rmation, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, none of Aureka or its directors, or any of their employees or agents, nor any other person accepts any liability, including,
without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information co nta ined in this presentation. In particular, no representation
or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reason abl eness or any forecasts, projections, prospects or
returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant
uncertainties and contingencies. Past performance is no guarantee of future performance.
This presentation may contain “forward -looking statements” within the meaning of securities laws of applicable jurisdictions. Fo rward -looking statements can generally be
identified by the use of forward -looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe”, “continue”, “obje ctives”, “outlook”, “guidance” or
other similar words, and include statements regarding certain plans, strategies and objectives of management and expected fin anc ial performance. These forward -looking
statements involve known and unknown risks, uncertainties and other factors, many of which are outside the control of Aureka and any of its officers, employees, agents or
associates. Actual results, performance or achievements may vary materially from any projections and forward -looking statements and the assumptions on which those
statements are based. Readers are cautioned not to place undue reliance on forward -looking statements and Aureka assumes no obligation to update such information
Competent Person Statement
The Mineral Resources and Ore Reserves statements and the Exploration Target potential statement are based on and fairly repr ese nts, information and supporting
documentation prepared by the Competent Persons. The Mineral Resources, Exploration Targets and Ore Reserves statement has be en approved by Mr Jozef Story, who is a
Member of the Australian Institute of Geoscientists (MAIG) (#10079). Mr. Story has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.” Mr. Story consents to the publishing of the information in this presentation in the form and context in which it appears.The
Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant ASX announcement continue to apply and have n ot materially changed.
Forward
Looking
Statement
2
aureka.com.au
ASX: AKA |
Exploration Target
On 18 June 2026, Aureka Limited ASX :AKA announced the increase to their maiden gold Exploration Target at its flagship 100% -owned Irvine Gold Project in Victoria, Australia. Notably, the Exploration Target upgrade was
constrained to the current drill footprint at the Resolution lode. The Exploration Target relating to and Adventure lode remains unchanged from the 2021 Maiden Resourced announce on 30 March 2021 by Navarre Minerals
Limited. The potential quantity and grade of both the Resolution Lode and Adventure Lode Exploration Targets are conceptual i n n ature, as at the time of reporting, there has been insufficient exploration to estimate a Mineral
Resource within these two areas and it is uncertain if further exploration will result in the estimation of a Mineral Resource in relation to these Exploration Targets . The Exploration Target has been prepared and reported in
accordance with the 2012 edition of the JORC Code. The Navarre portfolio was purchased and rebranded by the Aureka team in 2024. Significant potential exists to increase the size o f the exploration target with additional drill
results beyond the Exploration Target area. On 26 May 2025, Aureka (ASX.AKA), announced an updated Exploration Target total to include for historic drilling at St Arnaud, yielding a maiden JOR C resource and Exploration Target.
Summary of Relevant Exploration Data, Methodology, and Assumptions
Previously engaged consultants had, in conjunction with Company personnel generated an estimate of the Exploration Target for the Resolution and Adventure prospects. These Exploration Targets represent the strike and
depth/plunge extensions to the Mineral Resources defined for both deposits. The results of this estimation are presented in T abl e 1 for the combined Exploration Targets. The Resolution and Adventure prospects are intersected by
a predominantly west dipping shear zone which broadly mimics the strike of the Irvine basalt dome. Gold occurs on or adjacent to the shear zone, typically on meta -basalt/meta -sediment contacts where the rheological contrast
provides an ideal locale for shearing and mineralisation. The attitude of the contacts also influences the shear geometry res ulting in localised, high -grade gold shoots.
The Exploration Target was based on the interpretation of the following geology and mineralisation data that had been collate d a s part of the 2021 MRE statement:
▪ 42 structurally oriented diamond drillholes and169 aircore drill holes drilled by Navarre Minerals (NML ) and 8 structurally oriented diamond drillholes drilled by Aureka Liminted for a total of 28,152 m at the Resolution,
▪ 10 structurally oriented diamond drillholes and 195 aircore , drill holes for a total of 17,952 m at the Resolution prospect that have been drilled by Navarre Minerals (NML),
▪ 985 density measurements on mineralised diamond drill core, and the determined SG’s were applied to the appropriate lithological units involved with the Exploration Target,
▪ surface geological mapping, costean data and diamond core geological logging,
▪ detailed LiDAR imagery,
▪ geophysical datasets including detailed ground magnetic and 3D induced polarisation, and
▪ wireframing and modelling of the Resolution and Adventure mineralised bodies.
Two Advanced and four Conceptual Exploration Targets have been defined at the Resolution prospect. Targets considered Advanced are up -dip or along strike of known mineralisation and proximal to some anomalous legacy
aircore drilling and favourable geophysical response and range between 2.0 g/t gold and 2.3 g/t gold and because the exact dimensions are unknown, a lower limit of half the upper limit results in 1.33Mt, assuming trend derived
when calculating the the MRE update. Advance ET 1 was defined using the upper limit strike of 540m, down dip of 400m (excludes the area of shallow AC holes and only includes fresh rock material), a width o f 3m and a density of
3.8 g/cc and an average grade between 2.0g/t to 2.3g/t for a half the upper limit of 450kt; Advance ET 2 was defined using the upper limit strike of 1500m , down dip of 100m, a width of 5m and a density of 2.3 g/cc and an average
grade between 2.0g/t to 2.3g/t for a half the upper limit of 880kt. Targets considered Conceptual exist to the west of the main line of Lode, however form extensions to known historic mines. Broad trends are evident on the TMI
data however there is a lack of modern sampling data. The Conceptual Exploration Targets were defined using an upper limit strike of 4,000m , down dip of 100m, a width of 5m and a density of 2.35 g/cc and an average grade
between 2.0g/t to 2.3g/t for a half the upper limit of 2.35Mt.
For the Adventure prospect Exploration Target remains unchanged from 30March 2021 Maiden MRE and was estimated based on the wide spaced exploration drilling that has been completed to date. The mineralisation as
defined by these drill results does not currently have adequate confidence to be classified as a Mineral Resource. However, M ining Plus considers that the estimation of an Exploration Target is possible for the mineralised extents
that have been modelled. The ranges for tonnage, grade and ounces have been estimated using the Adventure block model results reported at a 1 g/t Au cut -off (Figure 10) for those estimated blocks remaining unclassified (that do
not satisfy the criteria of an Inferred Mineral Resource). A -20% and +30% range has then been applied to determine the ranges r equired for reporting an Exploration Target*. It is important to note that as these estimated blocks
do not meet the requirements of a Mineral Resource, there is increased likelihood of grade extrapolation, rather than interpo lation, hence the application of suitable tonnage, grade and ounce ranges for the Adventure Prospect
Exploration Target. The upper grade, tonnage and ounces range of +30% has been based on the presence of two of the higher gra de and thicker intercepts returned to date for Adventure being located at the base of the
Exploration Target.
Exploration
Target
3
aureka.com.au
ASX: AKA |
Continuous Diamond Drilling & Attractive
Valuation
• Previously peak ~$150m Market Cap on these assets in 2020
• Low EV = attractive EV per ounce of JORC
>450koz of JORC Resource 1 and > 600koz ETs 1
• Stawell Irvine: JORC Inferred (3 98koz @ 2.59g/t) 1
+ Advanced Exploration Target* ( 85-197koz @ 2 -2.3g/t) 1
+ Conceptual Exploration Target* (151 -348koz @ 2 -2.3g/t
• St Arnaud Comstock: JORC Inferred (56koz @ 1.21g/t)
+ Exploration Target* (112 -116koz @ 1.2 -1.0g/t) 2
Advanced Stage Gold Exploration Projects
• Existing discoveries and substantial projects
• Projects are proximate to operating mines
• Long term approach (e.g. permanent land access)
Clean Balance Sheet & Top Teir Team
• Top Tier Director and Executive team
• No debt and well funded for continuous drilling
• Backed by small Institutions and HNWs
4
aureka.com.au
*The potential quality and grade of this exploration target is conceptual in nature, there is currently insufficient explorat ion completed to support a mineral resource of this size and it is
uncertain whether continued exploration will result in the estimation of a JORC resource. The exploration target has been pre par ed in accordance with the JORC Code (2012). A detailed basis
for this statement, including the completed exploration activity, has been provided on slide 3 of this presentation
1 ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz. ASX Announcement: 13 Jun 2025: AKA - St Arnaud Maiden JORC MRE and Exploration Target Amended.
Positioned for significant growth
ASX: AKA |
ASX: AKA | 5
aureka.com.au
Percydale Under Cover
StA West Under Cover
Langi Logan South
Grange
Project Development Assessment (scoping)
Indicated Resource
Inferred Resource
Advanced Project
Follow-up Targets
Identified Targets
Ir vine: Resolution
Ir vine Dome: Adventure
Comstock (Concept study in progress)
Current exploration portfolio
DRILLING
• STAWELL CORRIDOR:
➢ Irvine : Resolution (Ongoing)
➢ Irvine: North Resolution (Ongoing)
• ST ARNAUD
➢ Comstock Extension
➢ Walkers (Ongoing)
Langi Logan Nor th
Morning Bill
New Bendigo
Jubilee (Main)
Westmere
Ir vine West
Jubilee (East)
Hollybush
STAWELL CORRIDOR
ST ARNAUD
JUBILEE
STAVELY ARC
0
0
3
3
4
6
Tatyoon
aureka.com.au
ASX:AKA | 6
Melbourne
Bendigo
Ballarat
Stawell
Stawell Corridor
Prospect
Cut -Off
Gold (g/t)
Inferred
Tonnes Gold Grade (g/t) Gold Ounces
Resolution OP* >0.5 1,775,000 2.16 123,000
Adventure OP >0.6 680,000 1.85 40,300
Total Irvine Open Pit* Various 2,455,000 2.07 163,300
Resolution UG* >1.0 2,335,000 3.13 235,000
Total Irvine (Stawell) Various 4,790,000 2.59 398,300
Stawell Corridor – Irvine Gold Project
aureka.com.au
ASX:AKA | 7
Southern Trend
Three prospective basalt
contacts underneath
Tertiary basalt cover
398koz Au Resource
with
85-197koz Advanced ET
181-348koz Conceptual ET
Au, Ag & Cu project
within the Stavely Belt
underneath Tertiary basalt
cover
Morning Bill
Irvine (+94koz Au)
Added*
398koz Au MRE
+500koz
Exploration Target
1 ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
ASX: AKA | 8
aureka.com.au
Stawell Corridor Key Achievements:
• Continued DD - nearly 5km DD completed at Irvine since Jan 2025
• Successfully identified high grade Tenacity Fault delivering record
high assays project to date:
• 10m @ 12.1g/t Au from 413m
• Incl 0.3m @ 183g/t Au from 413m
• and 0.3m @ 64.3g/t Au from 413.8m1
• 36% increase to MRE at Resolution2
• Improved Exploration Target Areas both Advanced & Conceptual
• Acquisition of high-resolution UAV magnetic dataset
• Strategic acquisition of property
• Immersion into local community
183g/t Au
1 ASX Announcement: Irvine Drilling Highest Assay Since Discovery – 15 Oct 2025
1 ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
ASX: AKA |
aureka.com.au 9
Stawell Corridor – 94koz Added to Irvine MRE
36% increase to Resolution MRE:
• Key factors for the considerable increase:
• Strong technical understanding & development of
both the regional & deposit scale structural &
mineral controls
• Continual refinement of learnings
• Application of knowledge to construct robust
geological models, in turn to create feasible
geological domains
• Continual DD campaign targeting mineralisation
within the ET
• Successfully identified new significantly mineralised
structures
• Applications of programs that continue to
demonstrate a larger fertile system with Moz
potential
Updated Resolution MRE Previous MRE
Prospect
Cut -Off
Gold (g/t)
Inferred
Cut -Off
Gold (g/t
Inferred
Tonnes Gold
Grade (g/t)
Gold
Ounces
Tonnes Gold Grade
(g/t)
Gold
Ounces
Resolution
Open Pit
>0.5 1,775,000 2.16 123,000 >0.5 1,754,000 2.09 118,000
Resolution UG >1.0 2,335,000 3.13 235,000 >1.0 1,455,000 3.12 146,000
Total
Resolution
Various 4,110,000 2.71 358,000 Various 3,209,000 2.56 264,000
JORC references: ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
ASX: AKA |
aureka.com.au 10
Stawell Corridor – 94koz Added to Irvine MRE
Zone Tonnes Grade Ounces %OP %UG Zone Tonnes Grade Ounces %OP %UG
Resolution Fault 2,165,000 2.54 177,000 47% 53% Tenacity HW 2 245,000 0.88 7,000 100% 0%
Resolution HW 2 510,000 2.29 37,000 12% 88% VG Domain 5,000 55.12 13,000 0% 100%
Resolution FW 1 15,000 2.28 1,000 100% 0% Link Zone 10,000 0.63 - 100% 0%
Resolution FW 2 10,000 0.93 - 100% 0% Resolution Low Angle 20,000 1.26 1,000 100% 0%
Tenacity Fault 1,055,000 3.30 112,000 34% 66% Resolution FW East 20,000 11.72 7,000 100% 0%
Tenacity HW 1 55,000 1.20 2,000 21% 79% Total 4,110,000 2.71 358,000 43% 57%
36% increase to Resolution MRE:
• 11 domains.
• Based on reinterpretation of
geological & structural model &
persistent additional 2025 DD
• Ongoing drilling programs continue
to drill test targets aiming to grow
Moz potential
Refer: ASX Release 18 June 2026: Global JORC
Resource Increase to over 450Koz.
aureka.com.au
ASX:AKA | 11
Stawell Corridor
• Continuous DD enabling the team to improve our technical
understanding of the structural & mineral controls
• Structurally complex – Tenacity/Resolution converging fault
margins host very high-grade gold intercepts
Schematic cross-section through Resolution Lode
Schematic long-section through Resolution Lode
JORC references: ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
ASX: AKA | 12
aureka.com.au
Stawell Corridor
Numerous Under-explored ETs
• 50m line spaced UAV Magnetic survey assisting with definition of
subsurface geological features & underlying structural architecture
• Updated MRE combined with favourable Mag & IP offers long term
targeting pipeline with potential to deliver further discovery
successes
• Engaging Dr. Barry Murphy - led the discovery of the 5.5 Moz Au
Bankan Gold Project in Guinea.
JORC references: ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
aureka.com.au
ASX:AKA | 13
Picture taken 6 June 2026 at drilling location 900m north of Resolution mineralization
aureka.com.au
ASX:AKA | 14
St Arnaud
Melbourne
Bendigo
Ballarat
Stawell
aureka.com.au
ASX:AKA | 15
New Bendigo
Parallel line of workings
with potential for high
grade gold
mineralisation
56 kOz Au Resource
112 -116 kOz Au
Exploration Target
Extension of St Arnaud
Gold Field for 45km
underneath Murray
Basin cover
Northern
Extensions
Comstock
(Nelsons Line)
Prospect
Cut -Off
Gold (g/t)
Inferred
Tonnes
Gold Grade
(g/t)
Gold
Ounces
Grade
(g/t)
silver
Silver
(oz)
Comstock >0.5 1,450,000 1.21 56,500 2.14 100,00
Prospect
Exploration Target*
Range Tonnes (Mt)
Gold Grade
(g/t)
Gold ounces
(k Oz)
Silver Grade
(g/t)
Silver
ounces (k
Oz)
Comstock
Lower 3.0 1.2 116 2.02 195
Upper 3.5 1.0 112 1.90 214
The preceding statements of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate significant figures.
*The potential quantity and grade of the Exploration Target is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource in
relation to this Exploration Target. It is uncertain if further exploration will result in the estimation of a Mineral Resource in relation to these Exploration Targets
See ASX Announcement – 13 June 2025
St Arnaud Gold Field 400koz @ 15g/t (Historic Production)
• Significant portfolio with regional upside beneath Murray
Basin Cover
• Primary short term focus has been surrounds of St Arnaud
and the Comstock Pit
aureka.com.au
ASX:AKA | 16
Key Achievements:
• 7 DD holes for 2,253m completed in 2025
• 6 of the 7 holes retuned significant Au intercept
• Au assays up to 109g/t
• Ag assays up to 650g/t
• Released a maiden MRE of 56koz @ 1.21 Au & 2.14 Ag from
legacy drilling.
• Obtained UAV hi-res imagery and LiDAR of pit & utilising for
concept studies & 3D geological modelling & projection of
drilling data.
• Concept studies in progress exploring avenues to near-term
small-scale production.
• Identified near surface opportunity to rapidly grow resource
below Walkers Shear within Comstock Pit – Drilling in progress
• Project structures from drill rig to pit wall to improve model and
build stratigraphic model - have identified offsets.
St Arnaud – Comstock Au/Ag
Assay results on this slide: ASX release 25 Feb 2026 - Comstock high grade Silver 650gt
aureka.com.au
ASX:AKA | 17
1 mm
1 mm
25NED002 @ 116.4 m: Gold and Galena (109g/t Au)
25NED007 @ 127.6 m: Gold and Arsenopyrite (31.5g/t Au)
St Arnaud – Comstock
Multiple Intercepts of Visible High-Grade Gold:
Assay results on this slide: ASX release 20 Nov 2025 St Arnaud Comstock high grade assays 109gt
aureka.com.au
ASX:AKA | 18
St Arnaud – Comstock Au/Ag
Key Achievements:
• Reaffirmation & infill DD currently in progress
• Concept Studies continue
Assay results on this slide: ASX release 29 May 2026 Comstock infill drilling commences
aureka.com.au
ASX:AKA | 19
Walkers Main Shear
aureka.com.au
ASX:AKA | 20
2021 MRE
Prospect
Cut -Off
Gold
(g/t)
Inferred
Tonnes Gold Grade (g/t) Gold Ounces
Resolution Open Pit* >0.5 1,775,000 2.16 123,000
Adventure Open Pit >0.6 680,000 1.85 40,300
Total Irvine (Stawell)
Open Pit*
Various 2,455,000 2.07 163,300
Resolution Underground* >1.0 2,335,000 3.13 235,000
Total Irvine (Stawell) Various 4,790,000 2.59 398,300
Comstock (St Arnaud) >0.5 1,450,000 1.21 56,500
Total All Projects Various 6,240,000 2.27 454,800
Prospect
Cut -Off
Gold
(g/t)
Inferred
Tonnes
Gold Grade
(g/t)
Gold Ounces
Resolution Open Pit >0.5 1,775,000 2.16 123,000
Resolution UG >1.0 2,335,000 3.13 235,000
Total Resolution Various 4,110,000 2.71 358,000
Prospect
Cut -Off
Gold
(g/t)
Inferred
Tonnes
Gold Grade
(g/t)
Gold Ounces
Resolution Open Pit >0.6 1,754,000 2.09 118,000
Resolution UG MSO 1,455,000 3.12 146,000
Total Resolution Various 4,110,000 2.71 264,000
Global – 94koz Resource Increase at Irvine (Resolution lode)
2026 MRE Update: 94koz increase
JORC references: ASX Release 18 June 2026: Global JORC Resource Increase to over 450Koz.
ASX: AKA |
Continuous Drilling from Jan -2025 to Present
• On -going diamond drilling in 2026 (after 7,000 metres in 2025)
• 4 holes with visible gold in 2025 plus high grade assays
• Sound structural and geological data to build robust models
• Drill testing new ETs
Victorian Mining is Moving Ahead
• 2x recent gold project approvals (CYL, SX2)
• 2x mineral sands mine approved
• Operating mine extensions
Strategy to Commercialisation
• Irvine flagship has million ounce potential, freehold land, successful
recent drilling on extensions of JORC Resource
• St Arnaud, Comstock – potential early producer - close to hungry mills
Size of Prize is Huge
• Neighbourhood of 5.3Moz Stawell Gold Mine
• Substantial JORC Resource plus Exploration Targets
• Right rocks and fertile system
21
aureka.com.au
*The potential quality and grade of this exploration target is conceptual in nature, there is currently insufficient explorat ion completed to support a mineral resource of this size and it is uncertain whether
continued exploration will result in the estimation of a JORC resource. The exploration target has been prepared in accordanc e with the JORC Code (2012). A detailed basis for this statement, including the
completed exploration activity, has been provided on slide 3 of this presentation
Positioned for Growth
ASX: AKA | 22
aureka.com.au
• Invaluable help from the locally based field Techs
• Tessa O'Callaghan – Exploration Field Assistant
• Natahlia Hart – Exploration Field Technician
• Technically strong and agile geology team
• Jozef Story – Exploration Manager
• Luke Rebbechi – Snr Exploration Geologist
• Harrison Keeble – Jnr Exploration Geologist
• Patrick Tucker – Consulting Geologist (Core Prospecting)
• Strong support and trust form the BoD’s
• James Gurry – Managing Director
• Angela Lorrigan – Non-Executive Director - Technical Director
• Graeme Hunt – Non-Executive Chairman
• Richard Taylor – Non-Executive Director
The Team Acknowledgment of the small but very capable AKA Team:
+61 3 9692 7222
aureka.com.au
ASX: AKA
Thank you!
Get The Latest
Aureka News
https://aureka.com.au/signup/
https://aureka.com.au/signup/
Sign Up
Share your feedback
Discover