FIRST MINERALISATION OUTSIDE UPDATED JORC
STAWELL CORRIDOR – IRVINE PROJECT
HIGH GRADE MINERALISATION INTERSECTED UP AND DOWN DIP OF THE RESOLUTION LODE,
PLUS FIRST MINERALISATION IN 2KM GAP BETWEEN RESOLUTION AND ADVENTURE LODES
• North Resolution - New mineralised structure at depth.
High grade mineralisation intersected at depth, signifying a new northern mineralised structure with
potential to deliver further growth beyond the recent 94koz increase to the current 398koz JORC
Mineral Resource1
. Significant assays at North Resolution include:
➢ 3.92m @ 4.74g/t Au from 238.82 (RD058 – Partial assays, any further results will be reported once
assays have been finalised and have passed QAQC):
▪ Including 0.72m @ 9.18g/t Au from 238.82m;
▪ And 0.5m @ 16.1g/t Au from 241.64m.
• South Resolution - high grade shallow mineralisation.
Drilling at South Resolution has revealed new areas of high-grade shallow mineralisation (from 155m
depth) immediately up-dip of the main mineralised trend, drilled within the Advanced Exploration
Target. Challenging ground conditions resulted in the drill hole terminating within the mineralised zone
and is to be re-targeted from another angle. Significant assays include:
➢ 3.5m @ 2.79 g/t Au from 155.1m (RD054);
▪ Including 0.7m @ 8.78 g/t Au from 155.1m,
➢ 1.7m @ 2.1g/t Au from 160m (hole terminated in 3.09g/t Au mineralisation – poor ground
conditions).
• First significant mineralisation in the 2km gap between Resolution and Adventure lodes.
Diamond drilling at Irvine has also delivered first time significant mineralisation within the under-
explored 2km gap between the Resolution (358koz1
) and Adventure Lodes (40koz3
) that together
comprise the Irvine Gold Project (398koz). The results confirm reef continuity only 75m vertically from
surface and are along strike to the south of the historic Eaglehawk mine and ~800m west of the
Resolution-Adventure Shear on the western side of the Irvine basalt.
All current JORC mineralisation at Irvine is on the east flank of the Magdala Basalt and these results on
the west flank demonstrate the expansion potential of the system, possibly akin to the 5.3Moz Magdala
Mine4
at Stawell (16km away) where mineralisation and mining has occurred on both sides of the
Magdala Basalt.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 2
15 SEPTEMBER 2026
Overall, these results indicate that even with 59km of drilling, vast opportunity remains and the Irvine
Gold Project continues to demonstrate growth potential. Drilling remains ongoing at Irvine, continuing to
target mineral extension within the Advanced Exploration Targets. Despite discovery in 2017 and
subsequent extensive drilling campaigns (59km of drilling thus far), the technical geological framework and
definitive mineralising controls at Irvine remain in their infancy and a vast opportunity to properly
understand and drill out the project to its full and first production potential still exists.
Managing Directors, James Gurry, said:
“Our flagship Irvine Gold Project continues to yield new mineralisation in multiple areas – at depth in the north,
closer to surface in the south, and west in the 2km gap between the lodes. The acquisition of Wedderburn Gold
Processing facility5
, one of only a small number of mills in Victoria, now provides all our projects with a conceptual
pathway to first production. While starting production from Fiddlers Creek followed by the previously mined
Comstock, the vast scale potential of the Irvine Gold Project continues to show why it is our flagship project and
ultimate value driver. “
Exploration Manager, Jozef Story said:
“As Aureka strives to increase upon the 398koz Mineral Resource1
at Irvine, these latest significant assay results
continue to affirm the remarkable fertility of the greater mineral system at Irvine. The most recent intercepts
successfully demonstrate extensions beyond current JORC Mineral Resource Estimate and the historically mined
Eaglehawk workings and reiterate the importance of exploring for additional gold mineralisation associated with
emerging second order structures distal to the main Irvine Shear, host to the Resolution and Adventure Lodes. The
Eaglehawk intercepts at Irvine are within an area where very limited diamond drilling has previously been
completed and the results continue to prove the potential for ongoing new discoveries as well as the expansive
preserved exploration upside that exists within the greater Irvine and Stawell mineralised corridor.”
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 3
15 SEPTEMBER 2026
AUREKA’S (PRO-FORMA) PORTFOLIO OF COMPLEMENTARY ASSETS
Aureka is an integrated Victorian gold company encompassing current production, near term development
and large-scale growth projects, as well as regional exploration opportunity (assuming successful close of
the mine and mill acquisition announced on 7 Sept 2026).
Aureka’s Inferred JORC Mineral Resources total approximately 455koz @ 2.27g/t Au. The flagship Irvine
Project has a JORC Inferred Mineral Resource of 398koz,1
and is located 16km from the operating Stawell
Gold Mine that has a production history of over 5Moz4
. The Fiddlers Creek Underground Gold & Silver mine
re-started production in 2025 as a high-grade smaller scale operation. To the north lies the St Arnaud
Comstock Gold & Silver Project with a JORC Inferred Mineral Resource of 56koz grading 1.21g/t gold6
in a pit
previously mined until 1995 and with a production licence in application.
The Wedderburn Gold Processing Mill is one of a limited number of gold mills in Victoria, currently processes
ore from Fiddlers Creek and has stated spare capacity. Aureka’s tenement package also includes the Jubilee
Gold Exploration Project near Ballarat, Morning Bill Gold and Base Metals Project on the Stavely Volcanics
(Stawell Corridor), and critical minerals potential in the greater St Arnaud area.
Figure 1: Plan view of Victoria including Aureka’s key projects with respect to the major nearby towns, cities & projects
This release relates to diamond drilling on Aureka’s flagship and largest project - the Irvine Gold Project - in the
multi-million-ounce Stawell Gold Corridor.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 4
15 SEPTEMBER 2026
NEWLY IDENTIFIED MINERALISED STRUCTURE BELOW RESOLUTION
Significant results received from RD058 are from within the updated Advanced Exploration Target previously
reported with the MRE update on 18 June1
and appear to be associated with a possible newly identified
northern mineralised structure immediately below and west the northern portion of the Resolution
lode.
Mineralisation occurs along the faulted margins between basalt and sediments and reinforces the current
geology model and the importance of the rheological contacts analogous to the +5Moz Magdala4
mine in
Stawell, approximately 16km to the north of Irvine. The newly identified structure has the potential to deliver
further down plunge high grade gold intercepts at depth with further drilling planned in due course.
Significant results returned from RD058* include;
○ 3.92m @ 4.74g/t Au from 238.82m
- Including 0.72m @ 9.18g/t Au from 238.82m
- And 0.5m @ 16.1g/t Au from 241.64m
○ And 0.95m @ 3.71g/t Au from 116.75m
* Diamond drilling results from RD058 are partial and any further significant results will be reported once
assays have been finalised and have passed QAQC.
NEAR SURFACE HIGH GRADE MINERALISATION WITHIN RD054
A Tenacity-styled HW structure (previously delivering some of the highest Au mineralisation to date
at Irvine7
) was intersected at 155.1m, returning individual assays values of up to 9.44g/t – the hole
ended in mineralisation. Significant high grade assay results were returned from drill hole RD054, drilled
into the Advanced Exploration Target immediately up-dip and to the south of the Resolution Lode. Poor
ground conditions within the drill hole due to increased structural complexity and the likely convergence of
nearby fault margins prevented full penetration of the targeted zone, causing the hole to be terminated
within the mineralised structures. Prior to termination a Tenacity-styled HW structure was intersected at
155.1m, returning individual assays values up to 9.44g/t.
A second significant impenetrable lower structure was intersected from 160m, interpreted as the up-dip
continuation of the main Resolution Fault, it caused the drill hole to terminate within high grade gold
mineralisation and resulted in the inconclusive drill testing of the projected target. Assays received from the
bottom of the drill hole returned 3.09g/t Au.
Extended assay turnaround times and prolonged QAQC validation due to structural complexity and
termination of hole RD054 that ended in mineralisation, meant the program was only recently concluded
and the diamond drill rig repositioned.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 5
15 SEPTEMBER 2026
Figure 2: Long section looking west of the Resolution Lode showing Resolution Fault and Tenacity Fault. Note: the reported intercept for RD058 is approximately 80m west of the Resolution
Fault and therefore is outside of the Inferred Mineral Resource area.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 6
15 SEPTEMBER 2026
FIRST TIME SIGNIFICANT MINERALISATION WITHIN THE 2KM GAP
Diamond drilling on the Irvine Project has also delivered first time significant mineralisation within the
2km zone separating the Resolution and Adventure Lodes. This significant mineralisation marks the first
drilling to successfully target and deliver gold mineralisation within the sizeable 2km gap that is apparent
between the Resolution and Adventure lodes, host to 398kozError! Bookmark not defined.
of gold resources.
Drilling was conducted below and along strike of the historic Eaglehawk mine, located approx. 800m west
of the main Resolution-Adventure Line.
Diamond drilling along strike of the historic Eaglehawk mine successfully discovered significant near
surface (75m vertical depth) and deeper (160m vertical depth) reef extensions approximately 50m
south/east from the legacy mine site. The drilling intercepts along strike of the Eaglehawk mine
successfully demonstrate the fertility of the greater Irvine project beyond Resolution and Adventure and
highlights the unrealised discovery potential that remains within the system. Assays returned include:
• 0.9m @ 3.84g/t Au from 145.9m and 0.2m @ 6.01g/t Au from 288.75m (EH002)
• 2.25m @ 1.34g/t Au from 90.7m with individual assays up to 3.04g/t Au (EH004)
• 1.0m @ 3.98g/t Au from 258m and 0.6m @ 1.68g/t Au from 308.95m (EH001)
Figure 3: Eaglehawk Cross Section with high grade gold mineralisation intercepts associated with reef extensions below and along
strike of the Legacy Eaglehawk mine.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 7
15 SEPTEMBER 2026
Figure 4:Targeted drill testing within the under-explored 2km gap between Resolution and Adventure lodes: Irvine Long Section with current drilling and intercepts outside current JORC
Resource1
1
ASX Release 30 March 2021 NML: Maiden Mineral Resource for Stawell Corridor Gold Project
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 8
15 SEPTEMBER 2026
RESULTS REAFFIRM ADVANCED EXPLORATION TARGETS FOR IRVINE
The most recent results reaffirm the current exploration strategy of continued drilling on the
Irvine project, highlights the necessity for continued exploration activities throughout the Irvine
mineral system and demonstrates the potential upside success that can be delivered when drill
testing robust geologic targets and conceptual key areas of interest, particularly on under-
explored targets of limited drilling activity.
Results from both RD054 and RD058 reaffirm the Advanced Exploration Targets to be highly
prospective for further JORC Resource growth to the north and south extents of the Resolution
Lode and further support the geophysical interpretation and appraisal of the Exploration
Targets completed during the Resource update1
and the recent work completed by Dr. Barry
Murphy2
(see Figure on following page).
As the Company strives toward growing the Irvine project to beyond 1Moz of gold resources,
ongoing drilling and field activities continue to target underexplored key areas of interest within
the Irvine Project, including potential mineralisation associated with emerging second order
structures distal from the main Resolution Shear in addition to identifying further lodes or lode
extensions at the Irvine Project.
Table 1 – Irvine Gold Project Resolution Lode – Updated Exploration Target Range
Prospect: Irvine Gold
Project
Exploration Target Range*
Tonnes (Mt) Gold Grade (g/t) Gold Ounces (k Oz)
Advanced Targets* 1.33 – 2.66 2.0 – 2.3 85 - 197
Conceptual Targets* 2.35 – 4.7 2.0 - 2.3 151 - 348
*The potential quantity and grade of the Exploration Target is conceptual in nature and there has been insufficient exploration to
estimate a Mineral Resource in relation to this Exploration Target. It is uncertain if further exploration will result in the estimation
of a Mineral Resource in relation to these Exploration Targets
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 9
15 SEPTEMBER 2026
Figure 5: Plan view of updated geology of Irvine overlain with Exploration Targets
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 10
15 SEPTEMBER 2026
IRVINE GOLD PROJECT (STAWELL ZONE) - BACKGROUND
The Irvine project area occupies the northern portion of the historic Ararat Goldfield and is hosted within
the Mooranambool Metamorphic Complex (MMC) of the Stawell Zone. The MMC is a narrow belt of
Cambrian turbidites and volcanic sequences with a dominant N-NW trend and is characterised by tight
folding, cleavage development and high-angle faults. The MMC is host to the 5.3Moz Stawell Goldfield4
,
including the currently operating Stawell Gold Mine.
Gold mineralisation at Irvine is associated with a package of steeply west dipping sheared basalt
(Simpson Basalt) and meta-sediments offset 50-80m from the eastern flank of a Cambrian basalt dome
(Irvine Dome) which is located on the hinge of an F2 antiform. Gold occurs on or adjacent to the shear
zone, typically on meta-basalt/meta-sediment contacts where the rheological contrast provides an ideal
locale for shearing.
Even with 59km of drilling, vast opportunity remains and the Irvine Gold Project continues to
demonstrate its growth potential. Drilling remains ongoing at Irvine, continuing to target mineral
extension within the Advanced Exploration Targets. Despite discovery in 2017 and subsequent extensive
drilling campaigns (59km of drilling thus far), the technical geological framework and definitive
mineralising controls at Irvine remain in their infancy and a vast opportunity to properly understand and
drill out the project to its full and first production potential still exists.
Exploration activities at Irvine have focused primarily on drilling proximal to the Resolution Lode and
consequently in June 2026 Aureka successfully announced an increase to 4,110kt inferred at 2.71g/t for
an estimated 358koz gold1
. The Adventure Lode component of the Mineral Resource is an inferred 680kt
grading at 1.85g/t gold for 40,300oz of gold as calculated in the 2021 maiden JORC Mineral Resource3
.
Cautionary Statement. There is a low level of geological confidence associated with inferred mineral
resources and there is no certainty that further exploration work will result in the determination of
indicated mineral resources or that the production target itself will be realised.
Table 2 – Aureka’s Global Mineral Resources
2
ASX Announcement: 13 Jun 2025: AKA - St Arnaud Maiden JORC MRE and Exploration Target Amended.
Prospect
Cut-Off
Gold (g/t)
Inferred
Tonnes Gold Grade
(g/t)
Gold Ounces
Resolution Open Pit* >0.5 1,775,000 2.16 123,000
Adventure Open Pit >0.6 680,000 1.85 40,300
Total Irvine (Stawell) Open
Pit*
Various 2,455,000 2.07 163,300
Resolution Underground* >1.0 2,335,000 3.13 235,000
Total Irvine (Stawell) Various 4,790,000 2.59 398,300
Comstock (St Arnaud)2
>0.5 1,450,000 1.21 56,500
Total All Projects Various 6,240,000 2.27 454,800
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 11
15 SEPTEMBER 2026
The preceding Statement of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may
occur due to rounding to appropriate significant figures.
Figure 6: Map showing Aureka’s Portfolio of Gold Assets in Western Victoria including the Core Prospecting assets the Fiddlers Creek
Underground Gold & Silver Mine, and Wedderburn Gold Mill – detailed in the acquisition announcement (see ASX Release 8 Sept 2026:
Aureka agrees Victorian Mine and Mill Acquisition of Core Prospecting Pty Ltd.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 12
15 SEPTEMBER 2026
Figure 7: Plan view of Exploration Targets overlain on RTP TMI image with Exploration Targets
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 13
15 SEPTEMBER 2026
Competent Persons Statements
The information in this announcement that relates to exploration results, data quality and geological
interpretation, is based on, and fairly represents, information compiled by Jozef Story, a Competent
Person who is a Member of the Australian Institute of Geoscientists (MAIG) (#10079). J Story has
sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity currently being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.’ J Story consents to the publishing of the information in this presentation in the form and context
in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant announcement and that all material assumptions
and technical parameters underpinning the estimates in the relevant ASX announcement continue to
apply and have not materially changed.
This announcement has been approved for release by the Board.
For further information, please contact:
James Gurry David Waterhouse
Managing Director Investor Relations
James.Gurry@aureka.com.au +61 407 880 937
+61 451 349 688
Footnote reference Table
1 ASX Release 18 June 2026: Global JORC Resource Increase to over 450koz
2 ASX Release 18 August 2026: Renowned Geologist Reaffirms Targets.
3 ASX Release 30 March 2021: Maiden Mineral Resource for Stawell Corridor Gold Project
4 11 Nov 2024 Stawell Gold Corridor Conference Presentation: Stawell-gold-corridor-conference-stawell-gold-mines-271124.pdf
5 ASX Release 7 Sept 2026: Victorian mine and mill acquisition - Placement and SPP
6 ASX Release 13 Jun 2025: St Arnaud Maiden JORC MRE and Exploration Target – Amended.
7 ASX Release 15 Oct 2025: Irvine Drilling Highest Assay Since Discovery
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 14
15 SEPTEMBER 2026
APPENDIX A
Hole
ID
Easting
(MGA)
Northing
(MGA)
RL
(AHD)
Azimuth
(MGA)o
Dipo
Total
Depth
(m)
Sample
Number
From To Length
Au
(g/t)
Interval/ Comment
RD054 665525 5881408 290 104 -66 161.7
AKA003685 51.35 52.35 1 0.66
2.05m @ 0.62 g/t Au from 51.35m
AKA003686 52.35 52.65 0.3 0.53
AKA003687 52.65 53.4 0.75 0.61
AKA003757 155 155 0.3 7.91
3.5m @ 2.79 g/t Au from 155.1m incl.
0.7m @ 8.78 g/t Au from 155.1m
AKA003758 155 156 0.4 9.44
AKA003759 155.8 156.5 0.65 2.38
AKA003760 156.5 157 0.5 0.35
AKA003761 157 157.6 0.65 2.03
AKA003763 157.6 158.6 1 0.59
AKA003765 160 161 1 1.4
1.7m @ 2.1g/t Au from 160m (note - hole
ended in mineralisation)
AKA003766 161 161.7 0.7 3.09
RD058 665133 5882009 290 24 -55 457.35
AKA004925 47 46 1 1.66 1m @ 1.66g/t Au from 47m
AKA004931 108.1 108.3 0.2 1.33
AKA004937 112.9 113.1 0.28 2.15
AKA004943 116.2 116.8 0.55 3.56
0.95m @ 3.71g/t Au from 116.75m
AKA004944 116.8 117.2 0.4 3.91
AKA004945 117.2 117.6 0.4 0.7
AKA004946 117.2 117.6 0.4 0.89
AKA004956 122.9 123.1 0.2 0.63
130 234 134 Awaiting Assays
AKA005431 238.82 239.08 0.26 9.65
3.92m @ 4.74g/t Au from 238.82 incl.
0.72m @ 9.18g/t Au from 238.82m and
0.5m @ 16.1g/t Au from 241.64m
AKA005432 239.08 239.28 0.2 0.22
AKA005433 239.28 239.54 0.26 15.6
AKA005440 240.7 240.92 0.22 1.76
AKA005441 240.92 241.22 0.3 4.09
AKA005442 241.22 241.64 0.42 1.72
AKA005443 241.64 242.14 0.5 16.1
AKA005446 242.14 242.35 0.21 1.44
AKA005447 242.35 242.54 0.19 0.13
AKA005448 242.54 242.74 0.2 5.77
AKA005450 243.4 244.1 0.7 0.61
AKA005452 244.4 244.6 0.24 3.28
248.2 457.4 209.2 Awaiting Assays
EH001 665494 5879648 339 52 -57 173.2
AKA003795 103.7 104 0.25 1.24
AKA003796 104 105 1 0.58
AKA003801 165.9 166.1 0.2 0.56
AKA003818 247.1 247.4 0.25 3.36
AKA003821 258 259 1 3.98 1m @ 3.98 g/t Au from 258m
AKA003841 286.4 286.7 0.3 0.64
AKA003850 309 309.6 0.6 1.68 0.6m @ 1.68 g/t Au from 308.95m
EH002 665494 5879648 339 48 -73 347.2
AKA003987 145.9 146.2 0.3 4.53
0.9m @ 3.84g/t Au from 145.9m
AKA003988 146.2 146.8 0.6 3.49
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 15
15 SEPTEMBER 2026
AKA003992 149.2 149.4 0.2 0.87
AKA004144 289 289 0.2 6.01 0.2m @ 6.01g/t Au from 288.75m
EH003 665571 5879696 336 47 -45 151.8
AKA003887 22.8 23.4 0.6 1.17
AKA003950 127.1 127.4 0.3 0.74
EH004 665571 5879696 336 96 -55 182.2
AKA004048 90.7 91.15 0.45 3.04
2.25m @ 1.34 g/t Au from 90.7m
AKA004049 91.15 91.4 0.25 0.77
AKA004050 91.4 91.95 0.55 1.02
AKA004051 91.95 92.5 0.55 0.03
AKA004052 92.5 92.95 0.45 1.97
JORC Code, 2012 Edition - Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
The May 2026 Mineral Resource estimate is upon
geological and assay data from surface diamond and AC
drill holes.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
The diamond drill core samples were selected on
geological intervals varying from 0.20m to 1.0m in length.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
Air Core and Reverse Circulation Drilling
All air-core (AC) & Reverse Circulation (RC) drill holes have
been routinely sampled at 1m intervals downhole directly
from a rig mounted cyclone. For AC holes, each metre is
collected and placed on a plastic sheet on the ground and
preserved for assay sub-sampling analysis as required.
For Reverse Circulation (RC) drill holes, each metre of
sampling is collected in individual sequentially numbered
plastic bags and preserved.
Sub-samples for assaying are generated from the 1m
preserved samples and have been prepared at the drill
site by either a spear sampling method (AC) or riffle split
(RC) based on logged geology and mineralisation
intervals.. Sub-samples have been taken at 1m intervals or
as composites ranging from 2-5m intervals ensuring a
sample weight of between 2 to 3 kg per sub-sample.
Diamond Drilling
All drill core was routinely cut in half (usually on the right
of the marked orientation line) with a diamond saw and
submitted for analysis.
Representative sample was ensured by a combination of
Company Procedures regarding quality control (QC) and
quality assurance/ Testing (QA). Certified standards and
blanks were routinely inserted into assay batches.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Air Core Drilling
AC drilling has been carried out using a Wallis Mantis 80
AC rig mounted on a Toyota Landcruiser base. The AC rig
used a 3.5” blade bit to refusal, generally just below the
fresh rock interface.
Reverse Circulation Drilling
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 16
15 SEPTEMBER 2026
Criteria JORC Code explanation Commentary
RC drilling was conducted using a track-mounted drill rig;
400psi 900cfm compressor and booster; auxiliary
compressor where dictated by water in-flows. The RC rig
used a 4” diameter RC hammer with 110mm button bit to
progress the hole to design depth or where groundwater
inflows compromise sample quality.
Diamond Drilling
Pre-collars were drilled to solid bedrock using an HQ3 drill
bit (93mm hole diameter) coring down to solid rock
followed by HWT casing diamond (114.3mm hole
diameter)
Diamond drilling of HQ3 (triple-tube) was undertaken
where possible to ensure maximum core recovery.
RD054 was drilled with HQ3 from collar to 86.7m and NQ3
to EOH at 161.7m
RD058 was drilled with HQ3 from collar to 82.5m and NQ3
to EOH at 459.8m.
EH001 was drilled with HQ3 from collar to 119.7m and
NQ3 to EOH at 311.95m.
EH002 was drilled with HQ3 from collar to 65.8m and NQ3
to EOH at 347.2m.
EH003 was drilled with HQ3 from collar to 95.7m and NQ3
to EOH at 151.8m.
EH004 was drilled with HQ3 from collar to 83.35m and
NQ3 to EOH at 182.2m.
All drill core was orientated with a Reflex ACT III core
orientation tool then continuously marked with a line
while on an angle iron cradle.
Upon completion of the primary hole a gyroscopic survey
of the hole was undertaken at a spacing of 1.0m along the
length of the hole.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Air Core and Reverse Circulation Drilling
AC & RC drill recoveries have been visually estimated as a
semi-quantitative range and recorded in the log
Recoveries are generally high (>90%), with reduced
recovery in the initial near-surface sample.
Samples are generally dry, but many became wet at the
point of refusal in hard ground below the water table.
Geological control was maintained at the drill site at all
times to ensure drilling and sampling was to required
standard.
Diamond Drilling
All diamond core was logged for lithology, alteration,
quartz veining and to a standard acceptable for
subsequent interpretation capturing any core loss, if
present, and recorded in the database.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Air Core and Reverse Circulation Drilling
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 17
15 SEPTEMBER 2026
Criteria JORC Code explanation Commentary
No sampling issue, recovery issue or bias has been picked
up and is considered that both sample recovery and
quality is adequate for the drilling technique employed.
Diamond Drilling
All drill depths are checked against the depth provided on
the core blocks and rod counts are routinely carried out
by the driller.
Core recovery for the areas sampled was generally good.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Diamond Drilling
Diamond drill core from this deposit generally has a high
recovery. Information from the diamond drilling does not
suggest that there is a correlation between recoveries and
grade with data supported reconciliation.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
All holes were logged in detail for a combination of
geological and geotechnical attributes to appropriate
stands to support a Mineral Resource.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
Geological logging of samples followed Company and
industry common practice. Qualitative logging of samples
included (but was not limited to); lithology, mineralogy,
alteration, veining and weathering.
The total length and percentage of the relevant
intersections logged.
All logging is quantitative, based on visual field estimates.
Detailed diamond core logging, with digital capture, was
conducted for 100% of the core by Aureka’s geological
team.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
Half core was sampled from NQ and HQ diameter drill
core.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
N/A - All samples within the Mineral Resource were
diamond holes
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Company procedures were followed to ensure sub-
sampling adequacy and consistency. These included (but
were not limited to), daily workplace inspections of
sampling equipment and practices
Blanks and
Share your feedback
Discover