Comstock - Multiple Visible Gold Intercepts on Walkers Zone
Released
Released
Announcement PDF
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 1
11 AUGUST 2026
A S X A N N O U N C E M E N T
COMSTOCK – MULTIPLE VISIBLE GOLD INTERCEPTS
ON WALKERS ZONE
ST ARNAUD – COMSTOCK PROJECT
• Multiple occurrences of visible gold intersected in Walkers Zone structures within hole
NED035, from as shallow as 18m vertically beneath current pit surface, measuring 1 - 2mm in
length, hosted in bedding parallel quartz veining.
• This is first visible gold intersected by Aureka within the secondary structures at
Comstock, known as the Walkers zone, and increases targeting confidence for additional
near surface mineralised intercepts as part of the infill and historical high grade affirmation
program. Assays from the visible gold samples are expected in 3-5 weeks.
• This drilling success occurs as part of the nearer term first production strategy for Comstock
with the licencing process underway and a binding toll milling partnership now in place1
with
the Wedderburn Gold Mill.
James Gurry, Managing Director, said: “I’m impressed to see Comstock delivering again with at
least two occurrences of visible gold this time located within the pit we have targeted for first
production. We drilled seven diamond holes at Comstock in 2025 with significant gold and/or silver
results in six of these holes – this repeated success in a previously mined pit demonstrates the value
we have at Comstock in the high-grade St Arnaud goldfield where, within 2km of our drill rig location,
there is a history of mining 400koz of gold at 15g/t.”
Cautionary Statement
The Company cautions that visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analysis. Laboratory assay results are required to determine actual grade of the visible mineralisation
reported in preliminary geological logging. Pictured in this release is visible gold only from NED035. Mineralisation
observations for NED035 are set out in Table 1 of this release. The Company will update the market when laboratory
analytical results become available.
FIRST SHALLOW VISIBLE GOLD ON WALKERS STRUCTURE
• The intersection of visible gold along the Walkers Structure marks a first for Aureka. While
numerous occurrences of visible gold have been previously reported by the Company within the
nearby Comstock Shear Structure, this is a first for the secondary structure the Walkers Shear that
branches to the south-east from the main Comstock line.
• Multiple Visible gold grains intersected at 21.7 metres down hole (approx. 18 metres vertical depth
from the current pit surface) and measure 1 - 2mm in length, hosted in bedding parallel quartz vein.
• An additional 13 grains of visible gold intersected at 61.2 metres down hole (approx. 40m vertical
depth from the current pit surface), and measure 0.5 – 2mm in length, hosted in a 3cm thick quartz
vein related to a larger quartz en-echelon extension vein set.
1
ASX Release, 14 Jul 2026: Aureka Signs Toll Milling Agreement
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 2
11 AUGUST 2026
Jozef Story, Exploration Manager, said: “It’s remarkable to see multiple visible gold intercepts from our
infill and reaffirmation program along on the Walkers Structures, and so proximal to the pit floor surface. The
near-surface visual occurrences of gold reinforce our targeting confidence to deliver additional shallow
mineralised intercepts on the pathway of our vision of first up small-scale production here at Comstock.”
This announcement relates to the presence of visible gold in hole NED035, part of the diamond drilling
program currently in progress aiming to infill and reaffirm legacy drill results along the Walker zone as
the company seeks small-scale first up production.
Elsewhere, diamond drilling continues at the Irvine Project (Stawell) exploring down dip continuity
in the north portion of the 398koz Resolution JORC Mineral Resource2
. The Resolution Lode hosts the
record high project assays of 10m @ 12.1g/t Au from 413m reported in October 2025 including, including
0.3m @ 183g/t Au from 413m and 0.3m @ 64.3g/t Au from 413.8m3
, and future testing of the new
Resolution footwall vein set identified in holes RD048 and RD0474
that both intersected high grade visible
gold.
Figure 1- St Arnaud Comstock – Walkers Shear: visible gold (NED035 21.7 m down hole) logging in progress, assays pending).
2
ASX Release, 18 Jun 2026: Global JORC Resources Increase to over 450koz
3
ASX Release, 15 Oct 2025: Irvine Drilling Highest Assay Since Discovery
4
ASX Release, 03 Dec 2025: Irvine Drilling – Resolution Footwall Delivers Hight Grade Results.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 3
11 AUGUST 2026
Figure 2: St Arnaud Comstock – Walkers Shear: visible gold (NED035 21.7 m down hole) logging in progress, assays pending).
Figure 3: St Arnaud Comstock – Walkers Shear: visible gold (NED035 61. 2m down hole)
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 4
11 AUGUST 2026
Figure 4 - Diamond Drilling within the Walkers pit at the Comstock Gold Project. Picture taken June 2026 and shows rig
targeting shallow depth drilling on the Walkers stockwork vein area and utilizing the existing pit access ramp.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 5
11 AUGUST 2026
COMSTOCK’S HISTORY OF HIGH GRADE & VISIBLE GOLD RESULTS
The visible gold occurrences within NED035 follow high-grade Visible Gold occurrences previously
reported within several drill holes drilled across the St Arnaud goldfield, including the most recent results
reported in December5
and November 20256
that included:
• 0.3m @ 31.5g/t Au from 127.5m (25NED007)
• 1m @ 65.37g/t gold (Au) from 116.2m (25NED002)
○ incl 0.3m @ 109g/t Au from 117.2m
○ and 0.4m @ 65.4g/t Au from 116.2m
• 10.04m @ 1.58g/t Au from 189.68m (25NED003)
• 15.39m @ 0.63g/t Au from 202.50m (25NED005)
INFORMATION REQUIRED UNDER ASX LISTING RULES FOR REPORTING VISIBLE RESULTS:
Table 1: Hole NED035 Visible Gold Mineralisation Observations
Hole From (m) To (m) Mineralisation Type
Mineral
Present
Abundan
ce Au
Timing for
release of Assay
Results
NED035 21.5 21.8
Visible gold hosted in bedding parallel
quartz vein
Gold <1% Up to 5 weeks
NED035 61.1 61.5
Visible gold hosted in thick quartz vein
related to a larger quartz en-echelon
extension vein set.
Gold <1% Up to 5 weeks
The Company cautions that visual estimates of mineral abundance should never be considered a proxy
or substitute for laboratory analysis. Laboratory assay results are required to determine actual grade of
the visible mineralisation reported in preliminary geological logging. Pictured in this release is visible
gold only from NED035.
• The visible gold Mineralisation observed within NED035 occurs below the previously mined Walkers Pit7
and is hosted within a bedding sub-parallel quartz vein.
• The visible gold is related to the Walkers Shear, a zone of bedding parallel gold mineralisation hosted
within massive quartz veins and related extension vein sets. The Walkers Shear zone strikes obliquely to
the historically mined Comstock Shear.
• The occurrence of additional visible gold at the Comstock Project continues to highlight the gold fertility
of the Comstock prospect, demonstrating the ongoing potential for further discoveries with potential to
improve upon the Maiden Resource at St Arnaud, reported in June 20258
.
5
ASX Release, 22 December 2025: St Arnaud Comstock – Shallow Visible Gold in New Structure
6
ASX Release, 20 November 2025: St Arnaud Comstock - High Grade Assays
7
ASX Release,13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target - Amended
8
ASX Release,13 June 2025: St Arnaud Maiden JORC MRE and Exploration Target - Amended
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 6
11 AUGUST 2026
Figure 5 – Plan View of the Walkers sub-pit and the Walkes main Shear with legacy drill intercepts projected to pit floor
surface9
. Red/yellow star indicates visible gold intercepts reported in this release.
9
ASX release 29 May 2026, Infill drilling commences at Comstock – All legacy drilling results were republished with JORC Tables in this release.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 7
11 AUGUST 2026
Figure 6 - St Arnaud Comstock Project showing previously reported drilling and intercepts outside current JORC Resource10
. Red/yellow star indicates visible gold intercepts reported
in this release.
10
ASX Release, 15 Oct 2025: Irvine Drilling Highest Assay Since Discovery
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 8
11 AUGUST 2026
The St Arnaud Comstock Project
St Arnaud Comstock Gold & Silver Project that is being positioned for early production with JORC Inferred
Mineral Resource of 56koz grading 1.21g/t gold11 in a previously mined pit and proximal to processing
mills including Wedderburn where Aureka has a processing agreement in place1
.
The Comstock prospect sits on the eastern margin of the Stawell Geological zone of the Lachlan Orogen
within the Saint Arnaud Group metasediments, which are unfossiliferous, quartz rich turbidites assumed
to be Cambro-Ordovician in age. Comstock is located within the historic St Arnaud Goldfields along the
Nelson line of reef and is situated approximately 2 kilometres north of the township of St Arnaud.
Locally, the geology of the Comstock project consists of a package of tightly folded turbidites with distinct
shale and sandstone layers of varying thicknesses. The area is dominated by a NNW trending, west
dipping fault/shear zone known as the Comstock Shear. The shear zone is interpreted to lie within the
hinge zone of a large-scale syncline and is confined by a wide, shale dominant zone of sediments. Shale
directly adjacent to the shear zone tends to be highly carbonaceous and very dark grey to black in colour.
Course euhedral pyrite crystals seem to be syngenetic to this carbon rich zone of fine sediments, quartz
veining is associated with gold mineralisation and is massive to stylolitic in texture.
Primary gold mineralisation at St Arnaud is hosted within quartz veins which are structurally controlled
within very complex structural domains associated with folding and NNW trending, west dipping thrust
faults. Gold mineralisation is hosted by quartz reef systems within brittle fractures and faults and can
extend from a few metres long to a few kilometres along strike but usually a few hundred metres. These
NNW trending reefs have steep plunging gold shoots. The mineralisation has a base metal signature of
Au + As + Ag + Pb. In historical records, the gold ore was characterised by a relatively high sulphide
content up to 5% pyrite, chalcopyrite, arsenopyrite, galena and silver. Most of the mines stopped at the
oxide-sulphide interface due to reduced grade and poor recoveries from sulphide ores. There appears
to be an association with green-black carbonaceous shales and higher gold grades.
Infill drilling program
The objective of the infill drilling campaign is, if results support it, to seek to support re-classification of a
portion of the current 100% Inferred Mineral Resource to a higher confidence category.
The infill diamond drill program for approximately 1,100 metres consists of thirteen short holes of
average depth under 100 metres. The program shall seek to:
1) Validate the data from historical drilling results,
2) Increase drill data density to, if successful, support a higher confidence level for sections of
the 100% Inferred Mineral Resource, and
3) Provide samples for metallurgical testing.
Successful infill drilling may, if results support it, allow re-classification of a portion of the current Inferred
Mineral Resource to a higher classification category. Re-classification is a necessary, but not sufficient,
step toward any future Scoping Study.
A compliant Production Target or any forecast financial information would also require completion of
Modifying Factor work (metallurgical, geotechnical, hydrogeological, processing, marketing,
environmental, social, legal, regulatory and capital cost) and would need to satisfy the ASX Listing Rules.
Investors should not assume that any of these outcomes will be achieved.
11
ASX Release, 13 Jun 2025: St Arnaud Maiden JORC MRE and Exploration Target.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 9
11 AUGUST 2026
Historical high grade drill results highlight the shallow mineralisation potential
As disclosed on 29 May 2026, historical high grade drill intercepts in the Walkers pit include:
• 100.8g/m - 14m @ 7.2g/t Au from 18m (SRC64 drilled by GenGold in 1984-85)12
• 60.2g/m - 2.2m @ 27.4g/t Au from 63.2m (STAD36 drilled in 1988) 13
• 53.4g/m – 3.1m @ 17.24g/t Au from 22.5m (STAD37 drilled in 1988)13
• 22.6g/m – 2.0m @ 11.30g/t Au from 68m (SRC65 drilled in 1985).13
A recent grab sample taken in April returned a grade of 6.04g/t gold13
. The sample was collected from a
continuous structure propagating along the western wall of the Walkers pit and represents a new target
yet to be drill tested.
Figure 7 – St Arnaud Comstock pit, picture taken from the west
12
Refer to ASX release 29 May 2026, Infill drilling commences at Comstock. The Company confirms that it is not aware of any new information or data that
materially affects the information included in that earlier announcement and, and with respect to the inferred mineral resource estimate, that all material
assumptions and technical parameters continue to apply and have not materially changed.
13
Refer to ASX release 29 May 2026, Infill drilling commences at Comstock
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 10
11 AUGUST 2026
AUREKA’S PORTFOLIO OF COMPLEMENTARY ASSETS
Aureka Limited is a Victorian gold company with a complementary set of gold assets and total inferred
gold resources 455koz2
. The flagship Irvine Project in the Stawell Corridor has a JORC Inferred Mineral
Resource of 398koz,14
is subject to continuous diamond drilling and is located 16km from the operating
Stawell Gold Mine. While Aureka continues to grow this large greenfield project, to the north-east lies the
St Arnaud Comstock Gold & Silver Project that is being positioned for early production with JORC Inferred
Mineral Resource of 56koz grading 1.21g/t gold15
in a previously mined pit and proximal to processing
mills including Wedderburn where Aureka has a processing agreement in place.
Aureka’s tenement package also includes the Jubilee Gold Exploration Project near Ballarat, Morning Bill
Gold and Base Metals Project on Stavely Volcanics (Stawell Corridor), and critical minerals potential in the
greater St Arnaud area.
Figure 9 – Aureka’s projects relative to the Wedderburn Gold Processing Mill, owned by Core Prospecting Pty Ltd, with which a milling
partnership has been signed.
14
ASX Release, 18 Jun 2026: Global Resource increase to over 450koz
15
ASX Release, 13 Jun 2025: St Arnaud Maiden JORC MRE and Exploration Target.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 11
11 AUGUST 2026
Competent Persons Statements
The information in this announcement that relates to exploration results, data quality, geological
interpretations, Mineral Resources and Ore Reserves statements and Exploration Target potential
statements for the St Arnaud Comstock Gold Project is based on, and fairly represents, information
compiled by Jozef Story, a Competent Person who is a Member of the Australian Institute of Geoscientists
(MAIG) (#10079). J Story has sufficient experience that is relevant to the style of mineralisation and type
of deposits under consideration and to the activity currently being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves.” J Story consents to the publishing of the information in this
presentation in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant announcement and that all material assumptions
and technical parameters underpinning the estimates in the relevant ASX announcement continue to
apply and have not materially changed.
The information in this announcement that relates to Mineral Resources and Ore Reserves
statements and Exploration Target potential statements for the St Arnaud Comstock Gold Project is
based on, and fairly represents, information compiled by Daniel Brost BSc (Economic Geology) - MSc
(Mine Engineering). D Brost is not employed by Aureka Limited and has acted as an independent
consultant on the Comstock Prospect Mineral Resource estimation. D Brost is a Chartered Professional
Geology and a Member of the Australasian Institute of Geologists (#221836) and has sufficient
experience with the style of mineralisation, the deposit type under consideration and to the activities
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). D Brost
consents to the inclusion in this report of the contained technical information relating the Mineral
Resource Estimation in the form and context in which it appears.
Exploration Target – Comstock Project
On 13 June 2025, Aureka announced the maiden gold Exploration Target at its 100%-owned St Arnaud
Comstock project in Victoria, Australia. Notably, the Exploration Target was constrained to the current
drill footprint at Comstock, as at the time this was the only area that contained sufficient drilling to
determine continuity and infer grade ranges. Significant potential exists to increase the size of the
exploration target with additional drill results beyond the Exploration Target area.
The potential quantity and grade of the Exploration Target is conceptual in nature and therefore is an
approximation. There has been insufficient exploration to estimate a Mineral Resource, and it is
uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration Target
has been prepared and reported in accordance with the 2012 edition of the JORC Code.
Summary of Relevant Exploration Data, Methodology, and Assumptions
The Comstock Shear Lode/veins are considered to have sufficient data to prepare an Exploration Target
estimate, using extrapolated mineral resource search distance within the solids and the mapped strike
length as a base case for determining overall strike length. Historical surface occurrences, soil
geochemistry and historical geophysical report were also used for the establishment of a clear
Exploration Target in the Comstock Prospect.
The strike length was adjusted using the proportion of positive intersections to estimate the mineralised
strike length of each shear structure. Each lode/vein was extrapolated up to 500 metres depth at a dip
of -75° to -90o based on the continuity of similar deposits in the Victoria goldfields, and a ‘base case’
estimation of tonnes and grade was applied to each reef.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 12
11 AUGUST 2026
The base case was used to approximate a range of tonnages and grades for the Exploration Target
estimate shown in Table 2 of the report, in accordance with the JORC Code (2012).
The ranges were derived from expected upper and lower volumes for the dominant rock types in each
shear structure and the 90% confidence interval for declustered true thickness and historical mining and
sampled drill hole grade data. The grade range was estimated based on the 90% confidence interval of
the grade of the positive shear intersections.
This announcement has been approved for release by the Board.
For further information, please contact:
James Gurry
Managing Director
James.Gurry@aureka.com.au
+61 451 349 688
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 13
11 AUGUST 2026
APPENDIX A
St Arnaud: Comstock Gold Project
JORC Code, 2012 Edition - Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Air Core & Reverse Circulation Drilling
• All air-core (AC) drill holes have been
routinely sampled at 1m intervals
downhole directly from a rig mounted
cyclone. Each metre is collected and
placed on a plastic sheet on the ground
and preserved for assay sub-sampling
analysis as required. For RC, each metre
of sampling is collected in individual
sequentially numbered plastic bags and
preserved.
• Sub-samples for assaying are generated
from the 1m preserved samples and
have been prepared at the drill site by
either a spear sampling method (AC) or
riffle split (RC) based on logged geology
and mineralisation intervals. Sub-
samples have been taken at 1m
intervals or as composites ranging from
2-5m intervals ensuring a sample
weight of between 2 to 3 kg per sub-
sample.
• Certified reference material and sample
duplicates have been inserted at regular
intervals with laboratory sample
submissions.
Diamond Core Drilling
• The diamond drill core samples are
selected on geological intervals varying
from 0.2m to 1.3m in length.
• All drill core is routinely cut in half
(usually on the right of the marked
orientation line) with a diamond saw
and submitted for analysis.
Representative sampling is ensured by a
combination of Company procedures regarding
quality control (QC) and quality assurance/
Testing (QA). Certified standards and blanks are
routinely inserted into assay batches.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 14
11 AUGUST 2026
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Air Core (AC) Drilling
• Legacy AC drilling has been carried out
using a Wallis Mantis 80 AC rig mounted
on a Toyota Landcruiser base. The AC
rig used a 3.5” blade bit to refusal,
generally just below the fresh rock
interface.
Reverse Circulation Drilling
• Legacy RC drilling has been conducted
using a track-mounted drill rig; 400psi
900cfm compressor and booster;
auxiliary compressor where dictated by
water in-flows. The RC rig used a 4”
diameter RC hammer with 110mm
button bit to progress the hole to
design depth or where groundwater
inflows compromise sample quality.
Diamond Core Drilling
• Legacy diamond drilling was conducted
using Deepcore track-mounted LM90
and LF130.
• Pre-collars have been drilled to solid
bedrock using an HWT (114.3mm) drill
bit followed by diamond coring with a
diameter of 63.5mm (HQ)
• Diamond drilling of HQ3 (triple-tube) is
undertaken to ensure maximum core
recovery.
• Drilling completed by Aureka was
conducted by AMWD
• Pre-collars were drilled to solid
bedrock using an HQ3 drill bit (93mm
hole diameter) coring down to solid
rock followed by HWT casing diamond
(114.3mm hole diameter)
• Diamond drilling of HQ3 (triple-tube)
was undertaken to ensure maximum
core recovery.
• Drill core has been orientated with a
Reflex ACT III core orientation tool then
continuously marked with a line while
on an angle iron cradle
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
Air Core & Reverse Circulation Drilling
• Legacy AC & RC drill recoveries have been
visually estimated as a semi-quantitative
range and recorded in the log.
• Recoveries are generally high (>90%), with
reduced recovery in the initial near-surface
sample.
• Samples are generally dry, but many became
wet at the point of refusal in hard ground
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 15
11 AUGUST 2026
preferential loss/gain of fine/coarse
material.
below the water table.
• Geological control maintained at the drill site
at all times to ensure drilling and sampling is
to required standard.
• No sampling issue, recovery issue or bias has
been picked up and is considered that both
sample recovery and quality is adequate for
the drilling technique employed.
Diamond Core Drilling
• All diamond core has been logged
capturing any core loss, if present, and
recorded in the database.
• All drill depths are checked against the
depth provided on the core blocks and
rod counts are routinely carried out by
the driller.
Core recovery for the areas sampled is generally
good.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• Geological logging of samples follows
Company and industry common practice.
Qualitative logging of samples includes (but
is not limited to), lithology, mineralogy,
alteration, veining and weathering.
• All logging is quantitative, based on visual
field estimates.
• Most if all AC & RC chips and core were
photographed in detail.
• For AC & RC, a small representative sample
has been retained in a plastic chip tray for
future reference and logging checks.
• Detailed chip logging, with digital capture,
has been conducted for 100% of chips logged
by previous geological teams.
• Detailed core logging, with digital capture
and digital photography, was conducted for
100% of the recent Aureka diamond drilling
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Air Core & Reverse Circulation Drilling
• Procedures have been followed to ensure
sub-sampling adequacy and consistency.
These included (but are not limited to), daily
workplace inspections of sampling
equipment and practices.
• Only recent core drilling incorporated blanks
and certified reference materials are
submitted with the samples to the laboratory
as part of the quality control procedures.
• AC composite, 1m individual and EOH
samples have been collected as grab
samples.
• Legacy drill sample preparation and base
metal and precious metal analysis is
undertaken by a registered laboratory (ALS
Perth, WA). Sample preparation by dry
pulverisation to 85% passing 75 microns is
undertaken by ALS Adelaide, SA.
ASX : AKA B R I N G I N G V I C T O R I A ' S G O L D T O L I F E 16
11 AUGUST 2026
• The sample sizes are considered appropriate
to correctly give an accurate indication of
mineralisation given the qualitative nature of
the technique and the style of gold
mineralisation sought.
Diamond Core Drilling
• Detailed diamond core logging, with
digital capture, has been conducted for
100% of the core by previous geological
team.
• Half core is sampled from NQ and HQ
diameter drill core.
• Company procedures have been
followed to ensure sub-sampling
adequacy and consistency. These
included (but are not limited to), daily
workplace inspections of sampling
equipment and practices.
• Blanks and certified reference materials
are submitted with the samples to the
laboratory as part of the quality control
procedures.
• No second-half sampling has been
conducted at this stage.
The sample sizes are appropriate to correctly
represent the sought-after mineralisation.
Quality of
assay data
and laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been
Share your feedback
Discover